Inspections for the day of: Tuesday, September 2, 2003.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01706 BLD-Final8/29/20039/2/20039/2/2003 12:00:00 AMACANC
ANDY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD02-02919 BLD-Framing/Rough-in8/29/20039/2/20039/2/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/29/2003 at 2:53:40 PM. Contact: ###-####. truss web breacing/ 3 ply mlb support/ two ply truss over stage justify not done that way. 9/2/2003 11:24:31 AM
BLD03-01118 BLD-Final8/29/20039/2/20039/2/2003 12:00:00 AMANR
TOM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD03-01997 BLD-Footing9/2/20039/2/20039/2/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/2/2003 at 7:19:47 AM. Contact: ###-####.
BLD03-01996 BLD-Footing9/2/20039/2/20039/2/2003 12:00:00 AMPPASS
SHANE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD03-01568 BLD-Final9/2/20039/2/20039/2/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/2/2003 at 9:07:59 AM. Contact: ###-####.final ok
9/2/2003 3:15:55 PM
BLD03-01618 BLD-Framing/Rough-in9/2/20039/2/20039/2/2003 12:00:00 AMPPART
17. (Sheet A2.0 – Door 27A - Door encroachment) Doors opening into the path of egress travel shall
not reduce the required width to less than one-half during the course of the swing. When fully open, the
door shall not project more than 7 inches into the required width. (2000 IBC 1003.2.3.1)/ maintane ceilling to 1 hr corridor/
BLD02-02781 BLD-Framing/Rough-in9/2/20039/2/20039/2/2003 12:00:00 AMPNR
MARK; Phone #: ###-#### Internet Inspection Request from: Marc Lileks PLEASE CALL PRIOR TO INSPECTION///MWL
BLD03-01706 BLD-Final9/2/20039/2/20039/2/2003 12:00:00 AMPPASS
ANDY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks