PLM03-02638
| Water and/or Sewer | 8/28/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | PASS |
|
|
###-#### marshall
|
PLM03-02646
| Water and/or Sewer | 8/28/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | PART |
|
|
had conf. with mr. rooter contractor to recall when sewer line has been uncoved tested and ready for inspection 9/2/2003 11:42:18 AM
|
PLM03-02170
| Plumbing Rough-in | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 6:55:45 AM. Contact: ###-####. need to install end of line cleanout,s need to pipe 1 inch up through water heater for water distribution called contractor will recall when ready 9/2/2003 8:50:58 AM
|
PLM03-02571
| Plumbing Rough-in | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | P | PASS |
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
PLM03-02166
| Groundwork | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | P | PART |
|
|
inspection am if possible
Thank you; Phone #: ###-#### Internet Inspection Request from: Liz Sasser groundwork on west side of building ok ok to cover 9/2/2003 3:10:40 PM
|
PLM03-02722
| Water and/or Sewer | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | P | PART |
|
|
peco- ###-#### sewer line only test ok ok to cover contractor to call when ready with water line 9/2/2003 2:50:10 PM
|