FIR03-00187
| INSP-Final Inspection | 8/26/2003 | 8/26/2003 | | A | |
|
|
|
FIR03-00157
| FIR-Aging Inspection | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | | PASS |
|
|
this building is still under construction 9/2/2003 7:51:54 AM
|
FIR03-00076
| INSP-Alarm Testing | 8/27/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Rick Jackson, horn test is at 9:00AM, see if you can be here a little earlier.; Phone #: ###-#### Internet Inspection Request from: Daniel Buccinon detector in corridor not closing dampers; need to verify with Sam Rogers about sync'ing strobes in several areas 9/2/2003 9:35:48 AM
|
FIR03-00136
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:38:34 PM
|
FIR03-00135
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:31:17 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:38:46 PM
|
FIR03-00115
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:36:25 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:31:17 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:38:55 PM
|
FIR03-00138
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:37:39 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:36:25 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:31:17 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:39:04 PM
|
FIR03-00137
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:39:03 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:37:39 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:36:25 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:31:17 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:39:22 PM
|
FIR03-00139
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:38:18 PM
|
BLD03-01118
| FIRE-Final Inspection | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | A | PART |
|
|
TOM; Phone #: ###-#### Internet Inspection Request from: Darla Downs per agreement with Sam Rogers and schools a temp is approved for fire/life safety pending approval/inspections of the fire alarm system 9/2/2003 1:01:02 PM
|
BLD02-02781
| FIRE-Final Inspection | 8/29/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 6:15:37 AM. Contact: ###-####. flow switch not tied in with the smoke detectors and there isn't an alarm inside 9/2/2003 2:27:49 PM
|
FIR03-00435
| INSP-Final Inspection | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 8:48:18 AM. Contact: ###-####. this permit was called in from Simplex/Grinnell by mistake 9/2/2003 3:41:12 PM
|
FIR03-00060
| INSP-Final Inspection | 9/2/2003 | 9/2/2003 | 9/2/2003 12:00:00 AM | P | FAIL |
|
|
flow switch not tied into any interior alarm notification device
|