MIS04-00240
| FIR-Final | 9/1/2004 | 9/2/2004 | 9/2/2004 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 9/2/2004 10:04:56 AM
|
BLD04-00279
| FIRE-Final Inspection | 9/1/2004 | 9/2/2004 | 9/2/2004 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled. Overspacing of the smoke heat vents was approved by Dave Miller on 9-1-04 as long as the approved smoke heat vents had been installed. Per the data sheets the smoke heat vents are approved. 9/2/2004 9:45:54 AM
|
BLD04-01510
| FIRE-Final Inspection | 9/2/2004 | 9/2/2004 | 9/2/2004 12:00:00 AM | P | FAIL |
|
|
repair exit sign and provide listing for outdoor use 9/2/2004 1:56:19 PM
|
BLD04-01559
| FIRE-Final Inspection | 9/2/2004 | 9/2/2004 | 9/2/2004 12:00:00 AM | P | PART |
|
|
This inspection was only for verification that the violating sprinkler pendant had been removed. Per Mike Bereman with Shilo no permit was required per Bill Alexander 9/2/2004 4:00:39 PM
|