BLD08-00234
| BLD-Wall cover | 9/2/2008 | 9/2/2008 | 9/2/2008 5:04:28 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 7:50:48 AM. Contact: ###-####. (2) Interior shear walls.... Lobby rm 151 and near West stair tower..... OK
|
BLD08-01726
| BLD-Framing/Rough-in | 9/2/2008 | 9/2/2008 | 9/2/2008 5:01:43 PM | P | PASS |
|
|
brian Phone #: ###-####
|
ESC08-00676
| Random Inspection | 9/2/2008 | 9/2/2008 | 9/2/2008 3:56:36 PM | P | PASS |
|
|
OK
|
BLD07-02644
| BLD-Footing | 9/2/2008 | 9/2/2008 | 9/2/2008 3:51:53 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 8:04:27 AM. Contact: ###-####. Verified 21' rebar UFER installed
|
BLD06-02320
| BLD-Conference | 9/1/2008 | 9/2/2008 | 9/2/2008 1:30:45 PM | A | PART |
|
|
Inspect roof trusses. Call me when you are on your way. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Preliminary truss inspection prior to pre-rock and frame inspection....Trusses appear OK in Bldg #2 & #3.
|
BLD08-01011
| BLD-Foundation | 8/29/2008 | 9/2/2008 | 9/2/2008 1:28:39 PM | A | PART |
|
|
dave - pouring at 11:00 Phone #: ###-#### Foundation rebar and forming OK......Talked to Dana about Verification of setback and easement with irrigation district and their approval for Building location.
|
BLD08-01863
| BLD-Framing/Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 12:15:31 PM | A | PART |
|
|
jock-please call prior to inspection Phone #: ###-#### Framing OK.......but need to .Check for support of sagging roof above area where Contractor cut ceiling joists (rafter ties) to allow for beam.
9-8-08 Per Jim Sly gave me verbal information that Jim was not sure if the roof was sagging prior to work or not, possibly could have been that way prior to start of this job. Jim says the rafters in that portion of the roof are hand stacked and were possibly over spaned when originally built, but believes that the structural integrity is not compromised at this time except for the original over spanned rafters that may need blocking in the future. Ok to close this permit at framing rough in stage for Jock MacGregor.
|
BLD08-01056
| BLD-Other | 9/2/2008 | 9/2/2008 | 9/2/2008 10:38:17 AM | A | PASS |
|
|
Grid inspection final in the Rx. Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD08-01700
| BLD-Footing | 9/2/2008 | 9/2/2008 | 9/2/2008 10:34:17 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 6:41:54 AM. Contact: ###-####.
|
BLD07-02290
| BLD-Conference | 8/28/2008 | 9/2/2008 | 9/2/2008 10:21:02 AM | A | DONE |
|
|
bob Phone #: ###-####
|