Inspections for the day of: Tuesday, September 2, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00470 Site Final9/2/20089/2/20089/2/2008 3:41:28 PMPPASS
ESC06-00324 Site Final9/2/20089/2/20089/2/2008 3:13:54 PMPPASS
ESC06-00255 Site Final9/2/20089/2/20089/2/2008 2:52:49 PMPPASS
Retaing wall completed.
CAS
ESC08-00661 BMP Violation8/29/20089/2/20089/2/2008 11:04:21 AMAPASS
ESC08-00549 Site Preparation8/26/20089/2/20089/2/2008 10:10:31 AMANR
ESC08-00400 Tracking Control8/29/20089/2/20089/2/2008 9:57:18 AMAPART
Site swept up but with the landscaping work, they are generating more sediment onto the hard surfaces. But will be cleaned when finished.
CAS
ESC08-00440 Site Final9/2/20089/2/20089/2/2008 9:52:03 AMAPASS
All disturbed soil has been stabilized. All temporary bmp's are removed.
CAS
ESC08-00525 Site Final9/2/20089/2/20089/2/2008 9:47:18 AMAPASS
All disturbed soil is stabilized and all temporary bmps have been removed.
CAS
ESC06-00342 Site Final9/2/20089/2/20089/2/2008 9:10:34 AMAPASS
ESC06-00343 Site Final9/2/20089/2/20089/2/2008 9:09:25 AMAPASS
ESC06-00344 Site Final9/2/20089/2/20089/2/2008 9:08:28 AMAPASS
ESC06-00345 Site Final9/2/20089/2/20089/2/2008 9:08:02 AMAPASS