ELE09-01638
| Final | 9/1/2009 | 9/2/2009 | 9/2/2009 4:06:51 PM | P | CANC |
|
|
Carol Phone #: ###-#### wrong type inspection, see ri, need to do final after floor box installed with cover, called contractor, no esc this project
|
ELE09-01638
| Electrical Rough-In | 9/2/2009 | 9/2/2009 | 9/2/2009 3:52:46 PM | P | PASS |
|
|
Carol Phone #: ###-#### need to see floor box when final for proper cover, contractor to provide access, the listed phone number is homeowner, and message returned after inspector out of area, called contractor, no esc this project
|
ESC09-00211
| Random Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 3:35:51 PM | P | PART |
|
|
looked ok
|
ESC09-00334
| General Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 3:31:46 PM | P | PASS |
|
|
looked ok
|
ELE09-01267
| Final | 9/2/2009 | 9/2/2009 | 9/2/2009 3:13:18 PM | P | PASS |
|
|
Mark Phone #: ###-#### ok to final
|
ELE09-01189
| Final | 9/1/2009 | 9/2/2009 | 9/2/2009 2:14:08 PM | P | PASS |
|
|
Please provide final inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean checked babana area, ok to final, no esc this project
|
ELE09-01629
| Temporary Service | 9/2/2009 | 9/2/2009 | 9/2/2009 12:33:41 PM | P | CANC |
|
|
Daryl Phone #: ###-#### see conference, no esc this project
|
ELE09-01629
| Conference | 9/2/2009 | 9/2/2009 | 9/2/2009 12:33:08 PM | P | DONE |
|
|
Daryl Phone #: ###-#### talked to contractor about mobile building not being listed for service attached, no grounding bushing, grounded service conductor not being connected to grounding electrode, and no panel schedule, no esc this project
|
ELE07-01638
| ELE-Aging Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 10:26:12 AM | A | DONE |
|
|
no activity
|
ELE07-00693
| ELE-Aging Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 10:25:03 AM | A | DONE |
|
|
no activity, suc, no inal requested yet
|
ESC08-00811
| General Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 10:18:45 AM | A | PASS |
|
|
looked ok
|
ELE09-01637
| Conference | 9/1/2009 | 9/2/2009 | 9/2/2009 10:10:48 AM | A | DONE |
|
|
Ryan Phone #: ###-####- call 30 mins prior to going for access met owner, reviewed outlet spacing, 1 1/4", box fill, left pictures, make-up, when to call for inspection, no esc this project
|
ELE09-01634
| Permanent Service | 9/1/2009 | 9/2/2009 | 9/2/2009 9:32:48 AM | A | PASS |
|
|
Fabian ###-#### called contractor, p/s u/g rec ok, no esc this project
|
ELE09-00572
| Permanent Service | 9/2/2009 | 9/2/2009 | 9/2/2009 8:15:25 AM | A | PASS |
|
|
Jack, the items listed on the red tag have been corrected and the service is ready to be signed off. Give me a call if you have any questions. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig corrections made, p/s u/g n ok
|