Inspections for the day of: Wednesday, September 2, 2009.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00579 INSP-Final Inspection9/1/20099/2/20099/8/2009 7:53:18 AMANR
Final - Contact: Dave Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
FIR08-00578 INSP-Final Inspection9/1/20099/2/20099/8/2009 7:53:08 AMANR
Final - Contact: Dave Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
FIR08-00577 INSP-Final Inspection9/1/20099/2/20099/8/2009 7:52:56 AMANR
Final - Contact: Dave Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
FIR08-00576 INSP-Final Inspection9/1/20099/2/20099/8/2009 7:52:44 AMANR
Final - Contact: Dave Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
FIR08-00448 INSP-Final Inspection9/1/20099/2/20099/4/2009 12:04:32 PMAFAIL
Need to provide an intermediate temp head at one location per residential head spacing table 7.5.5.3.
FIR08-00447 INSP-Final Inspection9/1/20099/2/20099/4/2009 12:01:48 PMAFAIL
Missing coverage at a mechanical room, two pendent heads need changed to intermediate temp. due to proximity to heat sources per NFPA table 7.5.5.3.
FIR08-00446 INSP-Final Inspection9/1/20099/2/20099/4/2009 11:59:19 AMANR
Project is not in condition for final at this time due to incompleted construction finishes, noted one SW head too far below the ceiling, and a missing head at a mechanical closet.
FIR08-00449 INSP-Final Inspection9/1/20099/2/20099/4/2009 11:55:16 AMAPASS
Fire sprinkler permit work approved for final.
FIR08-00445 INSP-Final Inspection9/1/20099/2/20099/4/2009 11:54:25 AMAPASS
Fire sprinkler permit work okay for final.
FIR08-00443 INSP-Final Inspection9/1/20099/2/20099/4/2009 11:53:49 AMAPASS
Fire sprinkler permit final inspection passed.
BLD05-03324 FIRE-Final Inspection9/1/20099/2/20099/4/2009 7:11:57 AMAPASS
Correction notice items finished with the exception of removal of the manual thumbturn at the office slider door- can be verified at structural final, fire life safety finaled.
BLD08-01137 FIRE-Final Inspection9/1/20099/2/20099/2/2009 4:55:10 PMAPASS
Fire life safety finaled.
FIR08-00437 INSP-Final Inspection9/2/20099/2/20099/2/2009 4:53:32 PMPPASS
Permit approved for final per activity entry dated 7/24.
FIR09-00261 INSP-Sprinkler Rough-in/Hydro9/2/20099/2/20099/2/2009 4:51:00 PMPPART
jeff Phone #: ###-####
FIR09-00519 INSP-Sprinkler Rough-in9/2/20099/2/20099/2/2009 4:50:31 PMPPART
Overhead system modifications per the scope of work are okay for ceiling cover.
FIR08-00815 INSP-Final Inspection9/2/20099/2/20099/2/2009 4:49:24 PMPCANC
Overbooked
FIR09-00387 INSP-Final Inspection9/1/20099/2/20099/2/2009 4:48:56 PMAPASS
Remainder of correction notice items verified for completion, inspection passed.
FIR09-00286 INSP-Sprinkler Rough-in9/2/20099/2/20099/2/2009 12:14:02 PMANR
Missing main feed and tie-in to unit 524 branchline piping 1st and 2nd levels, SW head at the closet is not installed.
FIR09-00285 INSP-Sprinkler Rough-in9/2/20099/2/20099/2/2009 12:11:06 PMANR
Unit 522 is not completed at this time.
FIR09-00283 INSP-Sprinkler Rough-in9/2/20099/2/20099/2/2009 12:09:05 PMAPART
Overhead rough-in inspection passed for unit 518.
FIR06-00379 INSP-Final Inspection9/1/20099/2/20099/2/2009 11:23:06 AMAPASS
Correction notice items are complete, fire sprinkler permit finaled.
FIR09-00470 INSP-Alarm Testing9/1/20099/2/20099/2/2009 11:21:58 AMAPART
See approved plan set for locations of rooms and devices tested today for a portion of the remodel area.
FIR09-00305 FIR-Aging Inspection9/2/20099/2/20099/2/2009 7:37:22 AM DONE
Work in progress, construction underway.