Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02496 FIRE-Final Inspection8/27/20099/2/20099/4/2009 9:54:13 AMPNR
Work is in progress on the corrections.
FIR09-00229 INSP-Final Inspection9/2/20099/2/20099/2/2009 5:00:27 PMPCANC
Sue Phone #: ###-#### Inspection has been resceduled for tomorrow by the fire alarm contractor.
BLD09-01209 FIRE-Conference9/2/20099/2/20099/2/2009 3:29:25 PMPDONE
I spoke to brandon about the need for a racking permit for the storage racks that exceed 8'-0" in height. I let him know that prior to any sign off on the cooler related BLD permit a racking permit will be required to be applied for.
FIR09-00495 INSP-Final Inspection9/2/20099/2/20099/2/2009 3:23:49 PMPFAIL
No city approved plans on site. Bruce said he would deliver them later.
FIR08-00830 INSP-Sprinkler Rough-in/Hydro9/2/20099/2/20099/2/2009 3:21:47 PMPPASS
The sprinkler piping at the first, second and third floor core areas are ok for cover.
FIR09-00506 INSP-Alarm Testing9/1/20099/2/20099/2/2009 1:23:47 PMAFAIL
Three ceiling mount a/v's as marked on the city approved plans are overspaced.
BLD09-01136 FIRE-Final Inspection9/1/20099/2/20099/2/2009 1:21:25 PMAPASS
life safety passed
FIR09-00483 INSP-Final Inspection9/1/20099/2/20099/2/2009 1:20:40 PMAPASS
Permit finaled.
FIR09-00493 INSP-Final Inspection9/1/20099/2/20099/2/2009 1:15:26 PMPPASS
Permit finaled
BLD09-01508 FIRE-Final Inspection9/1/20099/2/20099/2/2009 10:08:03 AMAPART