Inspections for the day of: Wednesday, September 2, 2009.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00537 Site Preparation9/2/20099/2/20099/3/2009 4:34:17 PM NR
BLD09-01130 BLD-Other9/2/20099/2/20099/2/2009 3:59:45 PMPPART
Matt Phone #: ###-####. Ceiling grid ok. pend approval from fire to cover.
BLD09-00733 BLD-Final9/2/20099/2/20099/2/2009 3:49:20 PMPPASS
Scheduled by a contractor via Hello! on 9/2/2009 at 6:27:38 AM.
BLD09-00733 DOC - Permit Finaled9/2/20099/2/20099/2/2009 3:49:12 PMPPASS
Cert. of occ. was issued.
ESC09-00266 Site Final9/2/20099/2/20099/2/2009 3:48:55 PMPPASS
ESC09-00266 DOC - Permit Finaled9/2/20099/2/20099/2/2009 3:48:46 PMPPASS
Final stabalization has been completed.
BLD09-00735 BLD-Final9/2/20099/2/20099/2/2009 3:48:25 PMPPASS
Scheduled by a contractor via Hello! on 9/2/2009 at 6:28:32 AM.
BLD09-00735 DOC - Permit Finaled9/2/20099/2/20099/2/2009 3:48:16 PMPPASS
Cert. of occ. was issued.
ESC09-00268 Site Final9/2/20099/2/20099/2/2009 3:47:58 PMPPASS
ESC09-00268 DOC - Permit Finaled9/2/20099/2/20099/2/2009 3:47:50 PMPPASS
Final stabalization has been completed.
BLD09-00736 BLD-Final9/2/20099/2/20099/2/2009 3:47:24 PMPPASS
Scheduled by a contractor via Hello! on 9/2/2009 at 6:29:12 AM.
BLD09-00736 DOC - Permit Finaled9/2/20099/2/20099/2/2009 3:47:17 PMPPASS
Cert. of occ. was issued.
ESC09-00269 Site Final9/2/20099/2/20099/2/2009 3:46:57 PMPPASS
ESC09-00269 DOC - Permit Finaled9/2/20099/2/20099/2/2009 3:46:50 PMPPASS
Final stabalization has been completed.
BLD09-01324 BLD-Conference9/2/20099/2/20099/2/2009 12:53:56 PMPFAIL
Needs to pick up permit within 10 days. Area is unsafe to occupy. Demo of the three walls is completed. Proper exiting has not been completed as per plan. c/n was issued.
BLD07-02624 BLD-Framing/Rough-in9/1/20099/2/20099/2/2009 12:52:06 PMADONE
marty Phone #: ###-####. Framing insp already completed by #316. Left message with Marty to see what he needed. No call back as of 12:52pm.
ESC09-00406 Site Preparation9/2/20099/2/20099/2/2009 12:51:06 PM PASS
ESC permit sign posted. BMP's in place. ok. as per plan.
ESC08-00102 BMP Violation9/2/20099/2/20099/2/2009 11:18:06 AMAPASS
BLD08-00272 BLD-Energy code compliance9/1/20099/2/20099/2/2009 11:17:54 AMAPASS
Gene Phone #: ###-####
BLD09-00846 BLD-Framing/Rough-in9/1/20099/2/20099/2/2009 10:37:25 AMAPASS
josh Phone #: 703-5. Interior non bearing wood framed wall ok. Located at back of building.
ESC07-01088 Random Inspection9/2/20099/2/20099/2/2009 10:14:45 AMAPASS
BLD07-02208 BLD-Framing/Rough-in9/1/20099/2/20099/2/2009 10:14:28 AMAPASS
Phone #: ###-#### Internet Inspection Request from: JIM LITTLE
BLD09-01136 BLD-Final9/1/20099/2/20099/2/2009 9:31:06 AMANR
jim Phone #: ###-####. Spoke with Jim noting that he neede a zoning final. Still needs fire as well.