BLD10-00053
| FIRE-Conference | 9/2/2010 | 9/2/2010 | 9/2/2010 5:00:18 PM | P | DONE |
|
|
Discussion with contractor regarding exit sign placement.
|
FIR10-00165
| INSP-Supply line flush | 9/1/2010 | 9/2/2010 | 9/2/2010 4:58:21 PM | P | PART |
|
|
UG fire supply line flush completed satisfactory.
|
BLD10-01305
| FIRE-Sprinkler Rough-in | 9/2/2010 | 9/2/2010 | 9/2/2010 4:57:36 PM | P | PART |
|
|
Overhead fire sprinkler work okayed for cover at the drop ceilings.
|
FIR10-00286
| INSP-Final Inspection | 9/2/2010 | 9/2/2010 | 9/2/2010 4:56:45 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR10-00146
| INSP-Final Inspection | 9/2/2010 | 9/2/2010 | 9/2/2010 4:56:03 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR10-00276
| INSP-Final Inspection | 8/28/2010 | 9/2/2010 | 9/2/2010 4:55:24 PM | A | PASS |
|
|
Fire alarm work passed inspection, permit finaled.
|