Inspections for the day of: Friday, September 2, 2011.
Number of inspections: 22
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-01376 BLD-Conference8/26/20118/29/2011 A 
Please check on this-do we need to expire?
ESC11-00076 Random Inspection9/2/20119/2/20119/2/2011 5:32:45 PMPPASS
BLD11-00285 BLD-Framing/Rough-in9/1/20119/2/20119/2/2011 5:32:36 PMPPASS
Reinspection. Thanks! Phone #: ###-#### >> Inspection requested via web by Scott Zierler
ESC11-00190 General Inspection9/2/20119/2/20119/2/2011 4:15:33 PMPPASS
BLD11-00687 BLD-Energy code compliance9/2/20119/2/20119/2/2011 4:15:05 PMPNR
david - late afternoon please Phone #: ###-####
BLD11-01429 BLD-Framing/Rough-in9/2/20119/2/20119/2/2011 3:24:18 PMPPART
Kent Phone #: ###-####. Deck framing not yet completed. Aslo needs to repair fur outs at all vaulted areas. Provide approved firestop per Astm E-814 atall thru and membrane penetrations, box out can light or provide rated can lights.
ESC11-00418 General Inspection9/2/20119/2/20119/2/2011 3:17:22 PMPPASS
BLD11-01675 BLD-Framing/Rough-in9/2/20119/2/20119/2/2011 3:03:29 PMPNR
Andrew Phone #: ###-####
BLD11-00377 BLD-Final9/2/20119/2/20119/2/2011 1:31:13 PMPPASS
>> Inspection requested via mobile web by Alan Fontenot
BLD11-00377 DOC - Permit Finaled9/2/20119/2/20119/2/2011 1:31:07 PMPPASS
ESC11-00231 Site Final9/2/20119/2/20119/2/2011 1:26:39 PMPDONE
ESC11-00231 DOC - Permit Finaled9/2/20119/2/20119/2/2011 1:26:28 PMPPASS
BLD11-00815 BLD-Final9/2/20119/2/20119/2/2011 1:26:16 PMPPASS
John Phone #: ###-####. Ok for perm occ.
BLD09-02146 BLD-Aging Inspection9/1/20119/2/20119/2/2011 1:06:27 PMACANC
BLD09-02146 DOC - Permit Expired9/2/20119/2/20119/2/2011 1:06:22 PMPPASS
No required inspections have been called in.
BLD11-01251 BLD-Framing/Rough-in9/1/20119/2/20119/2/2011 1:05:31 PMAFAIL
Rob Phone #: ###-####. Needs to provide staple equivelabcy chart from engineer for shear walls on clere story and for osb attachment on clere story.
BLD11-00380 BLD-Other9/1/20119/2/20119/2/2011 12:11:35 PMAPART
Ceiling Grid-- Jr Phone #: ###-#### or Dennis ###-####. Ok to place tile, will need to see packaging and safety film tags and clips.
BLD11-01587 BLD-Concrete9/1/20119/2/20119/2/2011 11:43:29 AMAPASS
samuel Phone #: ###-####
GCB11-00065 GCB-Final9/1/20119/2/20119/2/2011 10:55:13 AMAPASS
Ben @ ###-####Call for access. Structural final ok. No card to sign.
GCB11-00078 GCB-Footing9/1/20119/2/20119/2/2011 10:37:55 AMAPASS
Jason @ ###-####Call in advance. fOOTING AND STEMWALL OK.
GCB11-00043 GCB-Framing9/1/20119/2/20119/2/2011 10:27:23 AMAPART
Darin @ ###-####. Steel stud framing for new storefronts at area E and portion of area D. Aslo spoke with plan review regarding section IBC section 706.5.2 (horizontal projecting elements) for fire walls. Need to have fire walls located on plans and provide details for 1 hr. fire rated resistance construction were applicable.
GCB11-00061 GCB-Framing9/1/20119/2/20119/2/2011 9:21:38 AMACANC
Shane @ ###-####PM Inspection.. Drove out to jobsite, no rough ins are completed. Called shane with colony himes, he noted that he did not need the inspection and to cancel. Charging time due to driving out to jobsite.