FIR14-00537
| INSP-Sprinkler Rough-in/Hydro | 8/29/2014 | 9/2/2014 | 9/2/2014 3:36:29 PM | P | CANC |
|
|
Matt is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR14-00493
| INSP-Sprinkler Rough-in/Hydro | 9/2/2014 | 9/2/2014 | 9/2/2014 3:34:23 PM | P | PASS |
|
|
Tenting, rough to cover and hydro tests passed. Piping can be covered.
|
BLD13-02271
| FIRE-Final Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 1:38:28 PM | P | PASS |
|
|
life safety passed. Fire extinguishers are placed but brackets will not be available for acouple of days.
|
FIR14-00525
| INSP-Sprinkler Rough-in | 9/2/2014 | 9/2/2014 | 9/2/2014 1:32:16 PM | P | PASS |
|
|
Branchlines, hangers and drops ok. Will need another rough-in inspection prior to cover once the pendants are actually placed. Possible corrections needed for upright coverage outside of the new space at the roof deck
|
FIR14-00589
| INSP-Final Inspection | 8/29/2014 | 9/2/2014 | 9/2/2014 11:49:31 AM | A | FAIL |
|
|
Scope of work for this permit is complete such as the tamper, flow and pressure switches with tthe exception that the addresses have changed. The issue is the fire alarm notification needs to be modifed for code compliance in the remodeled/added areas. Also the existing areas are not code compiant for audio/visual coverage, sync'ing and temporal cadence.
|
FIR14-00537
| INSP-Supply line flush | 8/29/2014 | 9/2/2014 | 9/2/2014 10:33:54 AM | A | FAIL |
|
|
Matt is the contact. Thanks Phone #: ###-#### Left message on contacts voice mail that I was on the way. Arrived at job site and contact was not there. No underground flush performed. Also this permit number is for the overhead not the underground
|
FIR14-00248
| INSP-Final Inspection | 8/29/2014 | 9/2/2014 | 9/2/2014 10:17:01 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00566
| INSP-Final Inspection | 8/29/2014 | 9/2/2014 | 9/2/2014 10:15:50 AM | A | PASS |
|
|
Permit finaled
|