Inspections for the day of: Wednesday, September 2, 2015.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00707 Random Inspection9/2/20159/2/20159/2/2015 2:20:36 PMPPART
To inspect progress on new PW and ESC Requirements onsite.

Two New drains have been installed, along with the birm dramatically increased in size to capture runoff.
Remaining work:
1.) Install Wire Back Silt Fence below bottom drain in horseshoe shape, to capture any potential runnoff not entering bottom drain.
2.) Install Jute Mate in bottom of new catch basin (seed prior to installation of Jute Mat)
3.) Install Rip Rap around bottom drain for filtration.
ESC13-00520 Random Inspection9/2/20159/2/20159/2/2015 2:20:19 PMPPART
Inspection to see progress of new PW and ESC Requirements:

Two New drains have been installed, along with the birm dramatically increased in size to capture runoff.
Remaining work:
1.) Install Wire Back Silt Fence below bottom drain in horseshoe shape, to capture any potential runnoff not entering bottom drain.
2.) Install Jute Mate in bottom of new catch basin (seed prior to installation of Jute Mat)
3.) Install Rip Rap around bottom drain for filtration.
ESC14-00930 General Inspection9/2/20159/2/20159/2/2015 1:20:00 PM PASS
ESC14-00930 DOC - Permit Finaled9/2/20159/2/20159/2/2015 1:19:46 PMPPASS
Waddles Removed as requested
ESC Conditions Satisfied
ESC14-00488 General Inspection9/2/20159/2/20159/2/2015 12:50:17 PM PASS
No Issues observed at this time