BLD16-02336
| FIRE-Final Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 5:16:31 PM | P | PART |
|
|
Exterior emergency egress lighting required at two lobby exits, one interior emergency lighting to be replaced by main entrance.
Permanent occupancy load sign to be posted and FE (is on site) needs to by mounted.
|
FIR16-00289
| INSP-Sprinkler Rough-in/Hydro | 9/1/2016 | 9/2/2016 | 9/2/2016 5:01:51 PM | P | FAIL |
|
|
Roughin completed satisfactory. Hydrostatic test failed.
|