PLM96-02807
| INSP - Plumbing Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | | PART |
|
|
/ / 330 - secure pb to secured metal piping prior to hb attachment to
|
PLM96-02810
| INSP - Water lines FINAL | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | | PASS |
|
|
/ / 330 - partial water service house to sidewalk,
|
PLM96-02812
| INSP - Sewer/Water lines-FINAL | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | | PASS |
|
|
/ / 330 -
|
PLM95-01751
| INSP - Final | 9/19/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | A | PASS |
|
|
09/20/96 330 -
|
PLM96-01642
| INSP - Final | 9/19/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | A | FAIL |
|
|
09/20/96 330 - cap discharge side of interceptor, vent not thru roof in protection, equipment pro required thru-out. p.w.s is aware of existing discharging into new interceptor.
|
PLM96-01742
| INSP - Final | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | FAIL |
|
|
09/20/96 330 - PREFERS EARLY AFTERNOON no address posted
|
PLM96-02004
| INSP - Final | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | PASS |
|
|
09/20/96 330 -
|
PLM96-02078
| INSP - Final | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | FAIL |
|
|
09/20/96 330 - perminatly cap future lav waste
|
PLM96-02519
| INSP - Plumbing Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | FAIL |
|
|
09/20/96 330 - 3 W/C 5 LAV 3 TUBSHOWER 1 SINK 1 W/B 1 W/H air test on cpvc is prohibited
|
PLM96-02769
| INSP - Plumbing Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | FAIL |
|
|
09/20/96 330 - REINSPECTION no address posted
|
PLM96-02807
| INSP - Plumbing Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | PART |
|
|
09/20/96 330 - 2 W/C 3 LAV 2 TUB/SHOWER 1 SHOWER 1 SINK 1 W/B 1 W/H did this in the am
|
PLM96-02808
| INSP - Plumbing Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 12:00:00 AM | P | PART |
|
|
09/20/96 330 - TICKET LOBBY/SOUTHWEST AIRLINES/ FURNISH AND INSTALL SINK (WEST WING- 1ST FLOOR) partial r/i ok in walls only
|