PLM00-02999
| Sprinkler (Final) | 9/19/2000 | 9/20/2000 | 9/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ed Baxter
|
PLM00-03209
| Water and/or Sewer | 9/19/2000 | 9/20/2000 | 9/20/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/19/2000 at 15:27:52. Contact: ###-####. sewer ok 9/20/2000 4:40:08 PM
|
PLM00-02834
| Final | 9/20/2000 | 9/20/2000 | 9/20/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 07:32:18. Contact: ###-####. 9/20/2000 3:05:32 PM secure indirect waste piping under ice mechine, pipe ice bin drain, secure 3 comp. sink, calk all fixtures, soda mechine r.p. is too high lower and pipe drip cup to drain, test backflow preventors, set all equipment, dwv fittings required on all indirect waste piping. 9/20/2000 3:07:55 PM
|
PLM00-01853
| Final | 9/20/2000 | 9/20/2000 | 9/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 08:09:32. Contact: ###-####. contractor called in wrong number 9/20/2000 1:50:21 PM
|
PLM00-03320
| Water and/or Sewer | 9/20/2000 | 9/20/2000 | 9/20/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-03209
| Groundwork | 9/20/2000 | 9/20/2000 | 9/20/2000 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 330 On 9/20/2000 provide a plumbing plan wih arch. stamp showing all revised interior and exterior piping for attachment to approved plans
|