Inspections for the day of: Wednesday, September 20, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD98-02583 BLD-Conference9/19/20009/20/20009/20/2000 12:00:00 AMAPASS
David Newman ###-#### wants to change to steal joists form wood will have 9/20/2000 11:31:31 AM eng provide details 9/20/2000 11:31:49 AM
BLD00-01539 BLD-Wall cover9/19/20009/20/20009/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/19/2000 at 11:08:53. Contact: ###-####. framing ok 9/20/2000 10:37:43 AM
BLD99-02201 BLD-Framing/Rough-in9/19/20009/20/20009/20/2000 12:00:00 AMAPASS
###-#### drytwall shear ok 9/20/2000 11:05:22 AM
BLD00-02395 BLD-Framing/Rough-in9/20/20009/20/20009/20/2000 12:00:00 AMPPART
shear \\###-#### ok to side 9/20/2000 1:23:14 PM
BLD00-02304 BLD-Framing/Rough-in9/20/20009/20/20009/20/2000 12:00:00 AMPPART
FR -TIM ###-#### conf on 2 hr wall with 325 also 9/20/2000 4:10:21 PM
BLD00-01539 BLD-Energy code compliance9/20/20009/20/20009/20/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/20/2000 at 10:42:00. Contact: ###-####.
BLD00-02478 BLD-Final9/19/20009/20/20009/20/2000 12:00:00 AMPPASS
Express Wireless ###-####
BLD00-02391 BLD-Footing9/19/20009/20/20009/20/2000 12:00:00 AMPPASS
tim-- ###-#### ft
BLD00-00601 BLD-Framing/Rough-in9/18/20009/20/20009/20/2000 12:00:00 AMPPART
Jim ###-#### ok to 1st floor int and mech shat walls elev needs insp ofwalls 9/20/2000 4:09:28 PM
BLD00-02092 BLD-Energy code compliance9/18/20009/20/20009/20/2000 12:00:00 AMPPASS
Michael ###-####