Inspections for the day of: Thursday, September 20, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00594 BLD-Conference9/20/20019/20/20019/20/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 9/20/2001 8:27:44 AM W/ NEW SUPT...RE C/N ON SHEAR WALLS
BLD01-01792 BLD-Final9/19/20019/20/20019/20/2001 12:00:00 AMAFAIL
###-####; ok for t/o...complete glazing & verify fire 9/20/2001 5:08:11 PM
MIS01-00195 BLD-Final9/19/20019/20/20019/20/2001 12:00:00 AMAFAIL
MARK ###-####, unable to contact, left msg 9/20/2001 5:08:42 PM
BLD00-02793 BLD-Final9/19/20019/20/20019/20/2001 12:00:00 AMPFAIL
larry ###-#### fn; c/n...dampers, bolt at rear door, ahu shut down...need hvac as built for review, fire issues 9/20/2001 5:21:59 PM
BLD01-00186 BLD-Conference9/20/20019/20/20019/20/2001 12:00:00 AMPPART
Added by Inspector: 340 On 9/20/2001 5:17:35 PM keep c/n re joist burn thru, reviewed mti report, soils ok
BLD00-03729 BLD-Conference9/20/20019/20/20019/20/2001 12:00:00 AMPPART
Added by Inspector: 340 On 9/20/2001 5:19:13 PM reviewed mti soils reports, bsmt subgrade ok
BLD00-03393 BLD-Conference9/20/20019/20/20019/20/2001 12:00:00 AMPPART
Added by Inspector: 340 On 9/20/2001 5:34:16 PM verbal c/n to touch up spray on fire proofing at points thru-out bldg
BLD00-02375 BLD-Conference9/20/20019/20/20019/20/2001 12:00:00 AMPPART
Added by Inspector: 340 On 9/20/2001 5:33:03 PM w/ supt & Mike Spiker of MTI onsite... spandrel edge reinf detail & insp procedure. eng'r has approved modifications.
BLD99-03383 BLD-Conference9/20/20019/20/20019/20/2001 12:00:00 AMPPART
Added by Inspector: 340 On 9/20/2001 6:01:57 PM need repair fireproofing at" new" add'l beams...verbal c/n.