BLD01-00594
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/20/2001 8:27:44 AM W/ NEW SUPT...RE C/N ON SHEAR WALLS
|
BLD01-01792
| BLD-Final | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | FAIL |
|
|
###-####; ok for t/o...complete glazing & verify fire 9/20/2001 5:08:11 PM
|
MIS01-00195
| BLD-Final | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | FAIL |
|
|
MARK ###-####, unable to contact, left msg 9/20/2001 5:08:42 PM
|
BLD00-02793
| BLD-Final | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | FAIL |
|
|
larry ###-#### fn; c/n...dampers, bolt at rear door, ahu shut down...need hvac as built for review, fire issues 9/20/2001 5:21:59 PM
|
BLD01-00186
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/20/2001 5:17:35 PM keep c/n re joist burn thru, reviewed mti report, soils ok
|
BLD00-03729
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/20/2001 5:19:13 PM reviewed mti soils reports, bsmt subgrade ok
|
BLD00-03393
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/20/2001 5:34:16 PM verbal c/n to touch up spray on fire proofing at points thru-out bldg
|
BLD00-02375
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/20/2001 5:33:03 PM w/ supt & Mike Spiker of MTI onsite... spandrel edge reinf detail & insp procedure. eng'r has approved modifications.
|
BLD99-03383
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/20/2001 6:01:57 PM need repair fireproofing at" new" add'l beams...verbal c/n.
|