BLD01-01686
| BLD-Aging Inspection | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | | PASS |
|
|
exp. on 12-18-01 9/20/2001 9:46:36 AM
|
BLD01-01734
| BLD-Framing/Rough-in | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | PART |
|
|
ed ###-#### shear insp
ext. shear ok, (no sticker) 9/20/2001 11:46:06 AM
|
BLD01-00171
| BLD-Final | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 10:42:28. Contact: ###-####.
parts room ok for temporary occupy after fire and life signs off. NOTE; NO OCCUPANCY CERTIFICATE TO BE ISSUED YET, UNTIL COMPLETE SCOPE OF WORK IS FINISHED. 9/20/2001 10:34:11 AM
|
BLD01-01992
| BLD-Footing | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | PART |
|
|
###-####
basement ftgs, wip, ok 9/20/2001 11:45:05 AM
|
BLD01-02350
| BLD-Foundation | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | PART |
|
|
fd wall-corwin---- ###-####
poured 9/20/2001 9:36:16 AM
|
BLD01-02005
| BLD-Footing | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | A | PART |
|
|
###-####
not per plan, c/n posted( will meet citys requirments as built) mono pour///c/n to have arch. re-draw or provide letter to as built 9/20/2001 12:14:10 PM
|
BLD01-01423
| BLD-Footing | 9/19/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
###-#### SCOTT
wip 9/20/2001 3:06:55 PM
|
BLD01-02326
| BLD-Conference | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PASS |
|
|
for conf-- diana ###-####- call 1st before insp-for basement
conf. on framing, etc. 9/20/2001 2:34:53 PM
|
BLD01-01215
| BLD-Framing/Rough-in | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PASS |
|
|
###-#### bob
framing ok w/ corrections, energy ok also 9/20/2001 2:12:22 PM
|
BLD00-02594
| BLD-Framing/Rough-in | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
###-#### sanela
floor is dug out ok, ok to continue w/ floor joists and decking, verbal conf. on what to do next, elec. complete rouph, etc.///shear is ok also 9/20/2001 12:54:09 PM
|
BLD01-01702
| BLD-Framing/Rough-in | 9/20/2001 | 9/20/2001 | 9/20/2001 12:00:00 AM | P | FAIL |
|
|
shear 9/20/2001 12:27:44 PM
not nailed per plan, plans by furnace in garage 9/20/2001 2:24:01 PM
|