Inspections for the day of: Monday, September 20, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorLane Manuel
TitleSTRUCTURAL INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-01843 Final9/17/20049/20/20049/20/2004 12:00:00 AMAPASS
Steve -- homeowner, please call first for access.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD04-01487 BLD-Framing/Rough-in9/17/20049/20/20049/20/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 9/17/2004 at 11:52:26 AM. Contact: ###-####.
need fire and mech insp. also need mech permit 9/20/2004 10:10:03 AM
MEC04-02239 Pressure Test9/17/20049/20/20049/20/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/17/2004 at 1:44:32 PM. Contact: ###-####.
gas test x 4- units 101-104 all between 24-26psi 9/20/2004 11:13:13 AM
MEC04-02500 Final9/17/20049/20/20049/20/2004 12:00:00 AMAPASS
alternate # ###-#### Internet Inspection Request from: Aaron Alandt
24 psi 9/20/2004 9:25:31 AM
MEC04-02501 Final9/17/20049/20/20049/20/2004 12:00:00 AMAPASS
go to school- downto basement and cooks can show you where this is at///###-#### david
BLD04-00281 BLD-Framing/Rough-in9/20/20049/20/20049/20/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 9/20/2004 at 7:38:45 AM. Contact: ###-####.
need r-mech insp. prior to r-framing 9/20/2004 4:20:40 PM
MEC04-02504 Rough-in9/20/20049/20/20049/20/2004 12:00:00 AMPPART
r/i - mike ###-####
gas test only. 61 psi 9/20/2004 4:16:31 PM
BLD04-01875 BLD-Energy code compliance9/20/20049/20/20049/20/2004 12:00:00 AMPPART
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
r-13 walls/38 @ ceiling borders
CK: crawl___________
Blown attic_____________

Windows were not flashed, left c/n to correct before proceeding. 9/20/2004 1:35:15 PM
BLD04-00639 BLD-Framing/Rough-in9/20/20049/20/20049/20/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/20/2004 at 10:19:05 AM. Contact: ###-####.
exterior shear/roof nailing ok. Interior framing of shell ok. 9/20/2004 3:20:42 PM
BLD04-01952 BLD-Footing9/20/20049/20/20049/20/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/20/2004 at 10:22:01 AM. Contact: ###-####.
footings ok. #4 rebar ufer ok 9/20/2004 4:54:13 PM
BLD04-01247 BLD-Framing/Rough-in9/20/20049/20/20049/20/2004 12:00:00 AMPPART
Fire wall inspection please///###-#### mike
upstairs portion of interior firewalls ok, w/firestopping @ 10ft. oc 9/20/2004 1:59:32 PM
BLD04-00592 BLD-Framing/Rough-in9/17/20049/20/20049/20/2004 12:00:00 AMPPART
russell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
bathrooms, and office framing ok. 9/20/2004 3:37:35 PM