ELE06-00671
| Electrical Rough-In | 9/20/2006 | 9/20/2006 | 9/20/2006 4:15:02 PM | P | PASS |
|
|
tye Note: underground; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles sit lighting u/g ok to cover
|
ELE06-03469
| Electrical Rough-In | 9/18/2006 | 9/20/2006 | 9/20/2006 4:01:57 PM | P | FAIL |
|
|
Work performed by Steve Johnson.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz called, left corr notice, nec 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, 210.52(A)(1) recpts shall be installed so that no point along wall space is over 6' from an outlet, 314.20 boxes in combustible walls shall be flush with the finished surface, BCC all make-up shall be done, and boxes added
|
ELE06-03441
| Electrical Rough-In | 9/20/2006 | 9/20/2006 | 9/20/2006 3:22:09 PM | P | PASS |
|
|
TOBY WALLS; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy walls only ok to cover
|
ELE06-02254
| Electrical Rough-In | 9/20/2006 | 9/20/2006 | 9/20/2006 2:46:14 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 9/20/2006 at 7:11:46 AM. Contact: ###-####. u/g so side new bldg ok to cover, will be between bldgs
|
ELE06-01438
| Rough-In Permanent Service | 9/20/2006 | 9/20/2006 | 9/20/2006 1:43:00 PM | P | PASS |
|
|
daniel - call prior for access (outside insp only); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley p/s o/h n ok
|
ELE06-03261
| Rough-In Permanent Service | 9/20/2006 | 9/20/2006 | 9/20/2006 1:06:58 PM | P | PASS |
|
|
brian - ceiling & service; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley hard lid clgs ok to cover, p/s exst meter pak, 2 meters, n ok
|
ELE06-02059
| Permanent Service | 9/20/2006 | 9/20/2006 | 9/20/2006 12:30:53 PM | P | PASS |
|
|
This was called in incorrect before -should have been a RI/PERMANENT SERVICE NOT A PERMANET SERVICE SO IT IS NOW READY FOR A PERMANENT SERVICE PER JIM S. p/s o/h rec ok ok'd by 324 6-15-06, called ipco to confirm power apparently is on
|
ELE06-02621
| Final | 9/20/2006 | 9/20/2006 | 9/20/2006 10:42:17 AM | A | PASS |
|
|
If no answer at door call jason starner at 484 0180 he is the general contractor that said he was going to be there to day .Thank you and have a great day.; Phone #: ###-#### Internet Inspection Request from: steven sewell called contr, survey, nec 210.52(C)(1) recpt shall be installed in counter space 12" or wider, 406.5 recpt faceplates shall seat against mounting surface, Bcc range hood shall be listed and labelled, ok to final
|
ELE06-02588
| Final | 9/19/2006 | 9/20/2006 | 9/20/2006 9:55:04 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/19/2006 at 1:25:30 PM. Contact: ###-####. ok to final
|
ELE06-02613
| Final | 9/19/2006 | 9/20/2006 | 9/20/2006 9:21:36 AM | A | PART |
|
|
any questions please call James Lingelbaugh; Phone #: ###-#### Internet Inspection Request from: Jeff Radford down stairs ok except floor boxes, no mezzanine access- need to check, need to check elev, told needed showroom recpts
|
ELE06-00113
| Final | 9/19/2006 | 9/20/2006 | 9/20/2006 8:54:37 AM | A | PART |
|
|
gregg - partial final on 9th floor; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 9th fl recpts and clg except anop ok
|
ELE06-03478
| Final | 9/20/2006 | 9/20/2006 | 9/20/2006 6:27:52 AM | A | PASS |
|
|
ok to final
|