FIR06-00670
| INSP-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 4:23:20 PM | P | PART |
|
|
OH fire sprinkler is okay to cover at the drop ceiling areas, final pending ceiling tile and escutcheons.
|
FIR06-00418
| INSP-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 3:52:45 PM | P | PASS |
|
|
Fire sprinkler permitted work is complete, final inspection passed.
|
MIS06-00205
| FIR-Final | 9/20/2006 | 9/20/2006 | 9/20/2006 3:50:05 PM | P | PASS |
|
|
Fire life safety passed inspection, missing ceiling tile at the kitchen area to be replaced prior to structural final.
|
FIR06-00674
| INSP-Sprinkler Rough-in | 9/19/2006 | 9/20/2006 | 9/20/2006 3:48:19 PM | A | PART |
|
|
UG fire service supply line is acceptable for partial cover, will require an additional inspection to verify frost protection for portions of pipe which may be above min. bury depth.
|
FIR06-00703
| INSP-Final Inspection | 9/19/2006 | 9/20/2006 | 9/20/2006 3:42:34 PM | A | PASS |
|
|
Hood suppression system functioned properly under test conditions, permit finaled.
|
FIR06-00432
| INSP-Final Inspection | 9/19/2006 | 9/20/2006 | 9/20/2006 10:20:18 AM | A | PASS |
|
|
Field verified spare heads have been provided in the head boxes, per contractor the required annual inspections were completed on on 9/13/06.
|
BLD06-00231
| FIRE-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 12:00:00 AM | P | CANC |
|
|
wrong permit # Internet Inspection Request from: Barbara Buckley
|