FIR05-00644
| INSP-Conference | 9/20/2006 | 9/20/2006 | 9/20/2006 5:21:03 PM | P | DONE |
|
|
Contractor is installing fire resistant wood in the areas above the lobby ceiling. Hardlid is ok to cover.
|
BLD05-02880
| FIRE-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 5:19:53 PM | P | FAIL |
|
|
All items appear to be provided and corrected except for the 6" flu space required per the letter from Treasure Valley Fire Protection. Contractor is going to set up a conference with Sam Rogers.
|
MIS06-00231
| FIR-Final | 9/20/2006 | 9/20/2006 | 9/20/2006 2:27:32 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00566
| INSP-Final Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 1:45:40 PM | A | PASS |
|
|
Permit finaled
|
FIR06-00372
| FIR-Aging Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 10:48:48 AM | | NR |
|
|
John said he would verify that the job was done and call it in for friday.
|
BLD05-03106
| BLD-Aging Inspection | 9/20/2006 | 9/20/2006 | 9/20/2006 10:43:39 AM | | NR |
|
|
I spoke to julie about getting the correction notice taken care of and the inspection called in. She said that she would let the owner know and have him call me.
|
FIR06-00134
| INSP-Final Inspection | 9/19/2006 | 9/20/2006 | 9/20/2006 10:32:37 AM | A | FAIL |
|
|
Gas was not turned on to the hvac unit so no testing was done.
|