ELE07-02829
| Electrical Rough-In | 9/20/2007 | 9/20/2007 | 9/20/2007 4:36:36 PM | P | PASS |
|
|
allen ###-#### Note: floor heating master bath
|
ELE07-00558
| Electrical Rough-In | 9/20/2007 | 9/20/2007 | 9/20/2007 4:05:17 PM | P | PASS |
|
|
eric Phone #: ###-####
|
ELE06-04675
| Final | 9/20/2007 | 9/20/2007 | 9/20/2007 3:27:15 PM | P | PASS |
|
|
craig - please call 1/2 hr prior to inspection Phone #: ###-####
|
ELE07-02468
| Final | 9/20/2007 | 9/20/2007 | 9/20/2007 2:36:26 PM | P | PASS |
|
|
glen Phone #: ###-#### final ok with a survey for missing recep. in hall to master bedroom and 2 kitchen circuits the same on the directory.
|
ELE07-02377
| Final | 9/20/2007 | 9/20/2007 | 9/20/2007 2:03:21 PM | P | PASS |
|
|
glen Phone #: ###-####
|
ELE07-02617
| Final | 9/20/2007 | 9/20/2007 | 9/20/2007 2:02:59 PM | P | PASS |
|
|
glen Phone #: ###-####
|
ELE07-02095
| Electrical Rough-In | 9/19/2007 | 9/20/2007 | 9/20/2007 11:51:52 AM | A | PART |
|
|
skip Note: coverup Phone #: ###-#### entry ceiling ok
|
ELE07-02062
| Electrical Rough-In | 9/19/2007 | 9/20/2007 | 9/20/2007 10:52:31 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 11:15:51 AM. Contact: ###-####. sacrasty ok
|
ELE07-03240
| Rough-In Permanent Service | 9/19/2007 | 9/20/2007 | 9/20/2007 10:15:42 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 5:25:03 PM. Contact: ###-####. service requires electrode garage not open. bedroom and bath area only ok
|
ELE07-02816
| Electrical Rough-In | 9/19/2007 | 9/20/2007 | 9/20/2007 9:43:06 AM | A | PASS |
|
|
Issues have been addressed. Looking for permission to cover. Will get this attached to building permit ASAP. Please call Trent with any questions, ###-####. Thanks Trent. Phone #: ###-#### Internet Inspection Request from: Trent Reagan
|
ELE07-02288
| Electrical Rough-In | 9/19/2007 | 9/20/2007 | 9/20/2007 8:47:36 AM | A | PASS |
|
|
DAN Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
|