Inspections for the day of: Thursday, September 20, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWilliam E Thomas
TitleELE-INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-02860 Electrical Rough-In9/19/20079/20/20079/20/2007 3:24:16 PMPCANC
Requesting ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty
. 1. The drop cieling is ok for cover. .
ELE07-02871 Conference9/19/20079/20/20079/20/2007 2:58:49 PMPDONE
Frank, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
. 1. informed the owner how to call stuff in for the inspections. .
ELE07-02512 Final9/20/20079/20/20079/20/2007 2:41:16 PMPPASS
Thanks Mike, this job is ready for final inspection. Phone #: ###-#### Internet Inspection Request from: KATHY WEIL
. 1. Final ok. .
ELE06-03505 Final9/20/20079/20/20079/20/2007 1:56:33 PMPPASS
shawn - re-inspection Phone #: ###-####
. 1. final ok. .
ELE07-02915 Final9/20/20079/20/20079/20/2007 1:24:46 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
. 1. final ok. .
ELE07-03259 Temporary Service9/20/20079/20/20079/20/2007 1:02:03 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Brandon Blackham
. 1. The power pole must be able to stand up, it is laying on the ground. .
ELE07-03264 Electrical Rough-In9/19/20079/20/20079/20/2007 11:52:16 AMAPASS
ed Note: please call 1/2 hr prior to inspection Phone #: ###-####
. 1. ri ok. .
ELE07-03224 Final9/18/20079/20/20079/20/2007 9:51:20 AMACANC
Mike, this is a Fab remodel i took over from Del Elwood. SUP05 Phone #: ###-#### Internet Inspection Request from: Ken Heller
ELE07-03224 Conference9/20/20079/20/20079/20/2007 9:50:28 AMPDONE
Mike, this is a Fab remodel i took over from Del Elwood. SUP05 Phone #: ###-#### Internet Inspection Request from: Ken Heller
. 1. Neither of the two people that I met with are familiar with this project. .
. 2. The lead will reschedule for Monday. .
ELE07-00484 Final9/18/20079/20/20079/20/2007 9:40:50 AMAPASS
Final of B.4 Sulfuric Tank Install. pcook Phone #: ###-#### Internet Inspection Request from: Paul Cook
. 1. final ok. .
ELE07-02046 Final9/18/20079/20/20079/20/2007 9:40:02 AMAPASS
Final of Blanket Permit for Supervisor4. pcook Phone #: ###-#### Internet Inspection Request from: Paul Cook
. 1. final ok. .