BLD10-01509
| FIRE-Conference | 9/20/2010 | 9/20/2010 | 9/20/2010 3:12:06 PM | P | DONE |
|
|
I went over possible fire alarm requirements with Matt.
|
BLD10-01222
| FIRE-Final Inspection | 9/20/2010 | 9/20/2010 | 9/20/2010 2:33:53 PM | P | PASS |
|
|
life safety passed
|
FIR10-00374
| INSP-Final Inspection | 9/20/2010 | 9/20/2010 | 9/20/2010 2:32:30 PM | P | PASS |
|
|
permit finaled
|
FIR10-00456
| INSP-Sprinkler Rough-in | 9/17/2010 | 9/20/2010 | 9/20/2010 1:33:58 PM | A | PASS |
|
|
The sprinkler piping can be covered. I found that no permits have been pulled for the new ceiling and lighting. A parcel hold has been added. Herb Phone #: ###-####
|
BLD10-02030
| FIRE-Final Inspection | 9/17/2010 | 9/20/2010 | 9/20/2010 1:32:31 PM | A | FAIL |
|
|
See the city approved plans for a list of corrections required which include providing exit signs and emergency lighting, current inspection tags for the fire extinguishers, removing the deadbolt from the rear door and lowering the storage in the storage room.
|
BLD10-01703
| FIRE-Final Inspection | 9/17/2010 | 9/20/2010 | 9/20/2010 12:04:40 PM | A | PASS |
|
|
Life safety passed.
|
BLD10-01384
| FIRE-Final Inspection | 9/17/2010 | 9/20/2010 | 9/20/2010 11:16:03 AM | A | PASS |
|
|
life safety passed
|