Inspections for the day of: Tuesday, September 20, 2011.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00501 INSP-Final Inspection9/20/20119/20/20119/20/2011 5:29:21 PMPPASS
Hood suppression permit finaled.
FIR11-00516 INSP-Sprinkler Rough-in9/20/20119/20/20119/20/2011 5:28:37 PMPPART
UG fire supply line including the IBR approved for bury.
FIR11-00355 INSP-Sprinkler Rough-in9/20/20119/20/20119/20/2011 5:24:44 PMPPART
Reinspection for the second floor classrooms and 1st floor RR completed. Okay for cover at rooms 203, 205 and 206 new addition- noted one missing seismic brace at room 203. Restrooms 1st floor east side also approved for cover.
FIR11-00439 INSP-Sprinkler Rough-in/Hydro9/20/20119/20/20119/20/2011 2:42:28 PMPPART
Overhead hydrostatic testing passed. Also verified relocated pendent heads at the second floor.
BLD11-01585 FIRE-Conference9/20/20119/20/20119/20/2011 2:40:45 PMPDONE
On site conference with tenant regarding fire life safety conditions for occupancy approval.
FIR11-00501 INSP-Sprinkler Rough-in9/19/20119/20/20119/20/2011 2:35:15 PMAPART
Hood suppression system operated correctly under test conditions.
BLD11-00973 FIRE-Final Inspection9/19/20119/20/20119/20/2011 2:27:41 PMAPASS
BLD11-01653 FIRE-Final Inspection9/19/20119/20/20119/20/2011 2:26:59 PMAPASS
Fire life safety inspection completed satisfactory.
FIR11-00387 INSP-Final Inspection9/20/20119/20/20119/20/2011 2:25:41 PMPPASS
Fire sprinkler work passed final walkthrough. Permit finaled.