ELE16-00089
| Electrical Rough-In | 9/20/2016 | 9/20/2016 | 9/20/2016 3:46:37 PM | P | PASS |
|
|
Call Rafael for TCO inspection of the 2nd floor area "C". Phone #: ###-#### Inspection requested via web by Rafael Castillo TCO level 2 district building ok
|
ELE15-00495
| Electrical Rough-In | 9/20/2016 | 9/20/2016 | 9/20/2016 3:33:51 PM | A | PASS |
|
|
Walk 2nd floor 5 story for TCO. Contact is Toby Groves. ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Levels 1, 2, 3, core and shell temp occupy ok
|
ELE13-01291
| Conference | 9/19/2016 | 9/20/2016 | 9/20/2016 9:59:02 AM | A | DONE |
|
|
Tony ###-####. Flag pole bases. Contractor investigated base construction and rebar of flag pole base connected to building rebar system. Additional electrode not required as complete area installed above water membrane so true earth not available by installation of ground rods. Installation as is is sufficient.
|
ELE16-02164
| Final | 9/20/2016 | 9/20/2016 | 9/20/2016 9:37:08 AM | A | FAIL |
|
|
3535E Phone #: ###-#### Inspection requested via web by Alan Lusk 410.16- Luminaire shall have 12" clearance from storage shelf in closet under stairway. 422.20- Furnace shall have a disconnecting means with in sight of unit.
|