ELE16-01134
| Electrical Rough-In | 9/20/2017 | 9/20/2017 | 9/20/2017 3:08:22 PM | P | CANC |
|
|
We are requesting a final inspections on level 6,7, ; 8 for this afternoon. Our contact is Nic @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate Needed fina;s
|
ELE16-01134
| Final | 9/20/2017 | 9/20/2017 | 9/20/2017 3:08:09 PM | P | PART |
|
|
We are requesting a final inspections on level 6,7, ; 8 for this afternoon. Our contact is Nic @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate 6th floor minus 625 ADA room needs switch installed in kichen and king room all other rooms are ok
|
ELE16-01134
| Final | 9/20/2017 | 9/20/2017 | 9/20/2017 3:05:56 PM | P | PART |
|
|
We are requesting a final inspections on level 6,7, ; 8 for this afternoon. Our contact is Nic @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate All rooms are ok minus King room and 725 for switch in ADA room in kitchen
|
ELE16-01134
| Final | 9/20/2017 | 9/20/2017 | 9/20/2017 3:05:08 PM | P | FAIL |
|
|
We are requesting a final inspections on level 6,7, ; 8 for this afternoon. Our contact is Nic @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate 8th floor unit 802 short in wall sconce and open wires at location of light, room 825 ADA room needs light switch installed in counter in kitchen
|
ELE17-02808
| Final | 9/20/2017 | 9/20/2017 | 9/20/2017 2:39:23 PM | P | PASS |
|
|
All eleven service panels have been installed. Grounding is complete and circuit breakers are the agreed upon amperage. Ben Zimmer will be the contact. Phone #: ###-#### Inspection requested via web by Kelly Tarter Final ok
|
ELE17-03048
| Final | 9/20/2017 | 9/20/2017 | 9/20/2017 12:52:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson Final ok
|
ELE17-00862
| Final | 9/19/2017 | 9/20/2017 | 9/20/2017 12:37:06 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Final ok
|
ELE17-03122
| Electrical Rough-In | 9/20/2017 | 9/20/2017 | 9/20/2017 10:45:17 AM | A | PASS |
|
|
We Need To Have The Can Lights In The Kitchen Inspected As Welll As Some Walls Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Kitchen and formal dining only ok cover
|
ELE17-01862
| Final | 9/19/2017 | 9/20/2017 | 9/20/2017 9:48:26 AM | A | PASS |
|
|
Code 1905 Phone #: ###-#### Inspection requested via web by kevin blackmon Light box over master tub was blank off with no light fixture hanging at time of final. Final ok
|
ELE17-02890
| Electrical Rough-In | 9/20/2017 | 9/20/2017 | 9/20/2017 8:41:53 AM | A | PASS |
|
|
Wall with Panel rough in Phone #: ###-#### Inspection requested via web by Jason Wicks Panel wall only ok to cover
|