MEC17-04216
| Pressure Test | 9/20/2017 | 9/20/2017 | 9/20/2017 1:11:18 PM | P | PASS |
|
|
60# test
|
MEC17-04162
| Conference | 9/19/2017 | 9/20/2017 | 9/20/2017 11:00:08 AM | A | DONE |
|
|
consult with Dave - please call first Phone #: ###-#### Inspection requested via web by Brandon Sorensen Need 8" outside air to existing furnace and one 8" combustion air from outside to mechanical room. Undercut doors at restrooms and transfer air out of offices and conf room
|
MEC17-00009
| Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 10:45:48 AM | A | PART |
|
|
PARTIAL ROUGH IN ISPECTION Phone #: ###-#### Inspection requested via web by David Petsche ok to spray foam where ducts pass through ceiling and floor
|
MEC17-03024
| Final | 9/18/2017 | 9/20/2017 | 9/20/2017 9:49:15 AM | A | PASS |
|
|
Inspection requested via web by Don Dowers
|
MEC17-04203
| Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 9:07:07 AM | A | PASS |
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak may need transfer grille at dryer closet, verify at final
|
MEC17-04203
| Pressure Test | 9/19/2017 | 9/20/2017 | 9/20/2017 9:06:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak 20# gas test and 5# flue
|
MEC17-04229
| Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 8:41:53 AM | A | PART |
|
|
Please call 30 min, before going over. Phone #: ###-#### Inspection requested via web by Rene Neumeyer ok test gas line, two pipe chimney flue installed. No fireplace set yet. Need to see gas pipe connection at furnace for final
|