Inspections for the day of: Wednesday, September 20, 2017.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01432 General Inspection9/20/20179/20/20179/22/2017 3:27:21 PM CANC
ESC16-01512 General Inspection9/20/20179/20/20179/22/2017 3:27:15 PM CANC
ESC16-00159 General Inspection9/20/20179/20/20179/22/2017 3:26:38 PM CANC
ESC16-01404 Aging Inspection9/20/20179/20/20179/22/2017 3:26:33 PM CANC
ESC16-01608 General Inspection9/20/20179/20/20179/22/2017 3:26:29 PM CANC
ESC16-00437 General Inspection9/20/20179/20/20179/22/2017 3:26:23 PM CANC
ESC16-00436 General Inspection9/20/20179/20/20179/22/2017 3:26:18 PM CANC
ESC16-00435 General Inspection9/20/20179/20/20179/22/2017 3:26:13 PM CANC
ESC16-00948 General Inspection9/20/20179/20/20179/22/2017 3:25:57 PM PASS
BMPs (inlet protection installed). No trackout or discharges from subdivision. Multiple SFHs now in progress.
ESC16-01330 Aging Inspection9/20/20179/20/20179/20/2017 4:21:20 PM PASS
ESC16-01329 Aging Inspection9/20/20179/20/20179/20/2017 4:21:10 PM PASS
ESC16-01329 DOC - Permit Finaled9/20/20179/20/20179/20/2017 4:21:05 PMPPASS
ESC16-01330 DOC - Permit Finaled9/20/20179/20/20179/20/2017 4:20:57 PMPPASS
ESC16-01423 Aging Inspection9/20/20179/20/20179/20/2017 4:19:13 PM CANC
ESC16-01616 Aging Inspection9/20/20179/20/20179/20/2017 4:12:08 PM CANC
No activity on BLD permit in over 8 months. ESC permit expired.
ESC16-01616 DOC - Permit Finaled9/20/20179/20/20179/20/2017 4:11:42 PMPPASS
ESC16-01741 Complaint Inspection9/20/20179/20/20179/20/2017 3:29:14 PMPPART
No trackout or offsite discharges. Trash containment has been recently emptied. Some issues mentioned in complaint were not observed.

Correction requests:
- pick up litter from crew and unused nails and wrapping around site. In particular along the edges of the two homes bordering occupied homes.
- once rain water recedes, sweep street with push broom. Consider installing more gravel or road mix for loading/unloading or use alley for access.
ESC15-00957 General Inspection9/20/20179/20/20179/20/2017 3:21:03 PM CANC