BLD17-04447
| BLD-Concrete | 9/18/2018 | 9/19/2018 | | A | |
|
|
Hey Mike, we are placing a slab on grade tomorrow at 4am, strata will b onsite for rebar and concrete testing. You could look at our slab prep today if you come out for the grout placement Phone #: ###-#### >> Inspection requested via web by Jim Carriveau
|
BLD18-02973
| BLD-Final | 9/19/2018 | 9/20/2018 | 9/20/2018 4:40:01 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD18-02973
| DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 4:39:52 PM | P | PASS |
|
|
|
BLD17-01656
| FIRE-Final Inspection | 9/20/2018 | 9/20/2018 | 9/20/2018 3:58:55 PM | P | PASS |
|
|
Jack Phone #: ###-####. All issues have been resolved.
|
BLD18-01380
| BLD-Framing/Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 3:26:30 PM | P | PASS |
|
|
Rick Phone #: ###-####. Air seal pak ok.
|
BLD18-03027
| FIRE-Final Inspection | 9/19/2018 | 9/20/2018 | 9/20/2018 3:06:09 PM | P | NR |
|
|
Steve Phone #: ###-####. No one site. No call back. Will need to rechedule.
|
BLD18-02483
| BLD-Energy code compliance | 9/20/2018 | 9/20/2018 | 9/20/2018 2:56:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD18-02713
| FIRE-Final Inspection | 9/20/2018 | 9/20/2018 | 9/20/2018 2:41:04 PM | P | FAIL |
|
|
Russ Phone #: ###-####. Provide fire extinguisher with current inspection tag. Contractor to schedule fire conferance in the am for fire sprinkler and fire alram concerns.
|
BLD17-01247
| FIRE-Final Inspection | 9/20/2018 | 9/20/2018 | 9/20/2018 1:59:22 PM | P | FAIL |
|
|
Tim Phone #: ###-####. Repair the functioning emergency lighting.
|
FIR18-00729
| INSP-Sprinkler Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 1:15:10 PM | P | NR |
|
|
UG COVER INSP. ROY Phone #: ###-#### Inspection requested via web by Nathan Stenquist. Trench being excavated and lined with sand. Will need to recall when ready.
|
BLD17-03234
| FIRE-Final Inspection | 9/19/2018 | 9/20/2018 | 9/20/2018 11:55:31 AM | A | CANC |
|
|
call for bike rack location-Chris Phone #: ###-####
|
BLD18-01425
| BLD-Foundation | 9/19/2018 | 9/20/2018 | 9/20/2018 9:52:01 AM | A | PART |
|
|
James Phone #: ###-####. Exterior perimeter footings for Area 2. Noted 4 F4B type column pad footings that require top and bottom mats of #4 rebar. Only one mat has been installed at this time. Special inspector to verify repair of these 4 F4B column pad footings prior to concrete placement.
|
BLD18-02483
| BLD-Energy code compliance | 9/19/2018 | 9/20/2018 | 9/20/2018 8:50:24 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. No vapor retarder installed. Non of the additional requirements have been met to use latex paint.
|