ELE19-03514
| Permanent Service | 9/20/2019 | 9/20/2019 | 9/20/2019 1:47:18 PM | P | PASS |
|
|
The power is to be disconnected this AM to allow for changeout of wire between meter and panel due to solar installation. We will need an inspection IPCO to re-establish power. Steve Nuxoll is electrician on site. If possible, please call Steve to ensure that he is ready for inspection Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL p/s u/g rec ok
|
ELE19-03484
| Rough-In Permanent Service | 9/20/2019 | 9/20/2019 | 9/20/2019 1:47:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|
ELE19-03570
| Temporary Service | 9/20/2019 | 9/20/2019 | 9/20/2019 12:50:17 PM | P | PASS |
|
|
Temporary Power Pole by transformer south entry-building 1A Phone #: ###-#### Inspection requested via web by Stuart Welton t/s u/g n ok
|
ELE19-03568
| Electrical Rough-In | 9/20/2019 | 9/20/2019 | 9/20/2019 12:29:25 PM | P | PASS |
|
|
Partial Underground Phone #: ###-#### Inspection requested via web by Kevin Perez Underground from trans to sidewalk only ok to cover
|
ELE19-03472
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 11:30:40 AM | A | PASS |
|
|
Man door garage code 1224 for entry Phone #: ###-#### Inspection requested via web by Tyler Ridley final ok
|
ELE19-03430
| Electrical Rough-In | 9/19/2019 | 9/20/2019 | 9/20/2019 11:02:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Derrick Kitchen, Dining and Pantry ok to cover
|
ELE19-03511
| Electrical Rough-In | 9/19/2019 | 9/20/2019 | 9/20/2019 10:42:18 AM | A | PASS |
|
|
Please contact Micah at ###-#### before arriving so that we can give you access to this gated subdivision. Phone #: ###-#### Inspection requested via web by Jesse Simpson listing only ok
|
ELE19-03477
| Final | 9/20/2019 | 9/20/2019 | 9/20/2019 10:23:08 AM | A | PASS |
|
|
had perm service-but no final was done Final ok
|
ELE19-03340
| Rough-In Permanent Service | 9/19/2019 | 9/20/2019 | 9/20/2019 10:16:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn rough in ok p/s u/g n ok
|
ELE19-03563
| Conference | 9/19/2019 | 9/20/2019 | 9/20/2019 9:44:29 AM | A | DONE |
|
|
Please call Justin 30-45 minutes ahead so i can meet on site and go over job Phone #: ###-#### Inspection requested via web by A.M.E. Office Talked about recessed Swim spa clearences. Over head service drop shall be 10ft away from outside edge of pool. 24in or more recessed shall be treated as pool. EQ bond would be required. Recep needed 6ft away but not more than 20ft. Siding on shed is tin, will be changed to a wood siding. GFCI protection will be required.(680.30 Parts 1 and 3 of article shall apply)
|
ELE19-02700
| Rough-In Permanent Service | 9/18/2019 | 9/20/2019 | 9/20/2019 8:33:47 AM | A | CANC |
|
|
Contact Brandon for UFER in west footing before 9:00 a.m. concrete pour. Phone #: ###-#### Inspection requested via web by Tom Betty
|
ELE19-02700
| Electrical Rough-In | 9/20/2019 | 9/20/2019 | 9/20/2019 8:33:32 AM | P | PASS |
|
|
Contact Brandon for UFER in west footing before 9:00 a.m. concrete pour. Phone #: ###-#### Inspection requested via web by Tom Betty UFER only ok to cover
|