ELE00-03685
| Permanent Service | 9/20/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | A | PASS |
|
|
###-#### service only west end only P/S U/G N ok 9/22/00 1:55:33 PM
|
ELE00-03686
| Permanent Service | 9/20/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | A | FAIL |
|
|
building 16 east end cover only ###-#### Not ready $42.00 reinspection fee. 9/22/00 1:55:47 PM
|
ELE00-03531
| Electrical Rough-In | 9/20/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 12:16:03. Contact: ###-####. Ok cover r/I 9/22/00 1:59:55 PM
|
ELE00-01492
| Electrical Rough-In | 9/20/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 15:04:50. Contact: ###-####. Conf. need to put 2" concrete over underground conduit & we need to inspect before covering. 9/22/00 2:00:27 PM
|
ELE00-03587
| Final | 9/21/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 06:05:55. Contact: ###-####. Ok final 9/22/00 2:00:00 PM
|
ELE00-02571
| Electrical Rough-In | 9/21/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | P | NR |
|
|
bob-- ###-#### r/i Not ready 9/22/00 2:01:16 PM
|
ELE00-02649
| Final | 9/21/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | P | FAIL |
|
|
fn --re-insp-- john ###-#### Corr. hat tub needs to be wired 9/22/00 2:01:10 PM
|
ELE99-03547
| Electrical Rough-In | 9/21/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | P | PASS |
|
|
Frank ###-#### Ok cover underground 9/22/00 1:55:57 PM
|
ELE00-03702
| Electrical Rough-In | 9/21/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | P | FAIL |
|
|
John; ###-#### Corrections NEC 300-4(A) BCC need to see conduit underground 9/22/00 2:01:01 PM
|
ELE00-02652
| Final | 9/21/2000 | 9/21/2000 | 9/21/2000 12:00:00 AM | P | FAIL |
|
|
John; ###-####. Key on fireplace vent Corrections NEC 110-26-430-102(B)-370-21 9/22/00 2:01:43 PM
|