Inspections for the day of: Wednesday, September 21, 2005.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-03446 Electrical Rough-In9/21/20059/21/20059/21/2005 4:23:49 PMPNH
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called contr, they will recall
ELE05-03378 Temporary Service9/21/20059/21/20059/21/2005 2:49:09 PMPFAIL
please re-inspect. corrections have been made to pole. Thank you; Phone #: ###-#### Internet Inspection Request from: Nicole BCC Job ID sticker shall be posted, erosion control signs posted, 250.56 a single electrode shall be augmented by one additional electrode not less than 6' apart, 250.146 Equipment bonding jumper shall be used to connect the gnd terminal of the recpts to the grounded panel, called contr, left corr notice, fee due
ELE05-03453 Temporary Service9/21/20059/21/20059/21/2005 2:09:11 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dan Rohl called contr to drive in grd rod and move pole over. t/s u/g n ok
ELE05-02451 Final9/21/20059/21/20059/21/2005 1:33:36 PMPPASS
Ready for re inspect, please contact Duane, thank you; Phone #: ###-#### Internet Inspection Request from: Wendy Waters corrections made, ok to final, no card to sign
ELE05-03357 Electrical Rough-In9/21/20059/21/20059/21/2005 1:22:10 PMPPART
Scheduled by a contractor via Hello! on 9/21/2005 at 9:52:59 AM. Contact: ###-####. ok to cover walls only except at panel area, wrote corr notice, called cont r, 110.26(F)(1) there shall be no piping in dedicated electrical space
ELE05-03021 Final9/20/20059/21/20059/21/2005 12:40:27 PMPPART
olga; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no card signed, need to see furniture installation to final
ELE05-02872 Electrical Rough-In9/20/20059/21/20059/21/2005 12:13:56 PMPPASS
dave Note: ground grid ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover grounding, said to use 2 clamps for 2 wires on rod
ELE05-02806 Electrical Rough-In9/21/20059/21/20059/21/2005 12:11:22 PMPPART
south; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover soffit in diamond area only
ELE05-03128 Final9/21/20059/21/20059/21/2005 10:34:53 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Clyde Logan ok to final
ELE05-03357 Electrical Rough-In9/20/20059/21/20059/21/2005 9:49:30 AMACANC
Scheduled by a contractor via Hello! on 9/20/2005 at 3:06:52 PM. Contact: ###-####. Note: please call for code prior for lock box called contr, he wants pm inspection
ELE05-01972 Final9/20/20059/21/20059/21/2005 9:44:17 AMAPASS
Scheduled by a contractor via Hello! on 9/20/2005 at 7:05:47 PM. Contact: ###-####. ok to final
ELE05-03418 Electrical Rough-In9/20/20059/21/20059/21/2005 9:33:23 AMAPART
underground//john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover cnd only, need to see bonding
ELE05-02224 Electrical Rough-In9/21/20059/21/20059/21/2005 8:45:47 AMAPART
Scheduled by a contractor via Hello! on 9/21/2005 at 6:44:09 AM. Contact: ###-####. ok to cover ceiling except where panels located, kitcen area only, wrote correction notice 110.26(F)(1)(b) protection shall be provided in dedicated space to avoid damage to elect equip, left with foreman
ELE05-02217 Electrical Rough-In9/20/20059/21/20059/21/2005 8:43:17 AMAPART
Contact: Leon Sheffield - Site lighting on Capitol Blvd from Broad to Front; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ok to cover 2" as requested
ELE05-00855 Electrical Rough-In9/20/20059/21/20059/21/2005 8:42:22 AMANR
Contact: Lyle Dean- Slab rough-in inside building, 1st floor. corner of Myrtle & capitol; Phone #: ###-#### Internet Inspection Request from: Deb McCoy will re-call