BLD05-01927
| FIRE-Final Inspection | 9/21/2005 | 9/21/2005 | 9/22/2005 7:42:00 AM | P | CANC |
|
|
Need fire alarm plans submitted before an inspection can take place
|
FIR05-00434
| INSP-Final Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 4:00:07 PM | P | FAIL |
|
|
mike; Phone #: ###-#### Still need access door with signage and signage on the aux. drain valve on the north stairwell as per plans.
|
BLD05-00312
| FIRE-Final Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 3:47:43 PM | P | FAIL |
|
|
Not all door hardware has been changed to approved type. The doors into the north rooms still need correcting
|
FIR04-00650
| INSP-Alarm Testing | 9/16/2005 | 9/21/2005 | 9/21/2005 3:27:07 PM | P | FAIL |
|
|
Signage at the egress controlled doors per IFC 1008.1.8.6
|
FIR04-00664
| INSP-Final Inspection | 9/16/2005 | 9/21/2005 | 9/21/2005 3:24:53 PM | P | FAIL |
|
|
Provide signage on riser room door.
|
BLD05-02005
| FIRE-Final Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 2:08:26 PM | P | FAIL |
|
|
Provide indicator for the main exit lock as discussed and in review notes.
|
FIR05-00541
| INSP-Sprinkler Rough-in/Hydro | 9/21/2005 | 9/21/2005 | 9/21/2005 1:32:19 PM | P | PASS |
|
|
Rough-in inspection passed. Piping is ok to cover
|
FIR05-00515
| INSP-Final Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 12:00:00 AM | P | PASS |
|
|
permit finaled
|