FIR06-00384
| INSP-Alarm Testing | 9/25/2006 | 9/21/2006 | 9/25/2006 8:15:08 AM | A | DEFR |
|
|
|
FIR06-00618
| INSP-Supply line flush | 9/21/2006 | 9/21/2006 | 9/22/2006 8:08:06 AM | P | PART |
|
|
UG fire supply line and ductile riser stub are approved for cover.
|
FIR06-00626
| INSP-Sprinkler Rough-in/Hydro | 9/20/2006 | 9/21/2006 | 9/21/2006 3:46:31 PM | P | PART |
|
|
OH sprinkler rough-in is good for cover at the drop ceiling areas.
|
BLD06-01822
| FIRE-Supply Line Cover | 9/20/2006 | 9/21/2006 | 9/21/2006 12:11:32 PM | A | FAIL |
|
|
wally; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection was requested for an UG fire supply line cover which was installed without a fire permit. No inspection done, informed contractor to submit plans and obtain permit prior to completion of work or request for inspection. Double fees will apply.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 9/20/2006 | 9/21/2006 | 9/21/2006 12:07:41 PM | A | PART |
|
|
OH rough-in is acceptable to cover at the drop ceiling areas in the SE quadrant of the second floor as marked on approved plans. Hydrostatic test for this same area also performed satisfactory.
|
BLD06-01819
| FIRE-Final Inspection | 9/20/2006 | 9/21/2006 | 9/21/2006 10:45:21 AM | A | PASS |
|
|
Life safety is satisfactory, inspection passed.
|
BLD06-01078
| FIRE-Final Inspection | 9/20/2006 | 9/21/2006 | 9/21/2006 9:57:14 AM | A | PASS |
|
|
Life safety inspection passed.
|
FIR06-00444
| INSP-Supply line flush | 9/20/2006 | 9/21/2006 | 9/21/2006 9:12:51 AM | A | PART |
|
|
UG fire supply line flush performed satisfactory.
|
FIR06-00376
| INSP-Alarm Testing | 9/14/2006 | 9/21/2006 | 9/15/2006 1:29:24 PM | A | CANC |
|
|
Complete testing of all fire alarm devices within the B24C project 8790 remodel area at all levels.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|