Inspections for the day of: Thursday, September 21, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-02921 Rough-in9/21/20069/21/20069/22/2006 4:34:01 PMPPEND
casey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..this phone number has been disconnected???
MEC06-02447 Final9/21/20069/21/20069/22/2006 10:26:20 AMAPASS
Scheduled by a contractor via Hello! on 9/21/2006 at 4:54:02 AM. Contact: ###-####.
MEC06-02732 Final9/21/20069/21/20069/21/2006 4:39:51 PMPNH
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..called shawn for access info..no return call
MEC05-03323 Rough-in9/21/20069/21/20069/21/2006 4:39:13 PMPPEND
rough re inspect monte on site; Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN..out of time, please reschedule for fri..please put monte's phone number in the notes
MEC06-02493 Final9/21/20069/21/20069/21/2006 4:37:58 PMPPEND
Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN..out of time..please reschedule for fri pm..thanks
MEC06-02660 Pressure Test9/21/20069/21/20069/21/2006 4:34:53 PMANR
Scheduled by a contractor via Hello! on 9/21/2006 at 6:56:52 AM. Contact: ###-####...out of time..called g/c to have you reschedule for fri am
MEC06-01842 Final9/20/20069/21/20069/21/2006 4:10:09 PMAPART
call Don A for schedule - on site ; Phone #: ###-#### Internet Inspection Request from: Allison Briggs..called don to reschedule for fri am..thanks
MEC06-00875 Final9/20/20069/21/20069/21/2006 4:08:16 PMANR
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS...hi missy, will you please reschedule this for fri and try to steer me in the right direction??? thanks so much..dixie
MEC06-02643 Final9/20/20069/21/20069/21/2006 2:32:26 PMAFAIL
Customer requested anytime after 9:00 but still in the a.m. Please call Justin before going out. He will show you where all the equipment is at. Thank you!! Veronica; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt..hi veronica, i met with the owner today and you guys have some corrections. so will you please schedule "chris" to meet me and justin (the owner) monday at 1:00..please have chris call me to confirm asap...thanks dixie
MEC06-03093 Rough-in9/21/20069/21/20069/21/2006 2:29:26 PMPPEND
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch..hi shelley, deidre with advanced heating will call you when she calls their r/i in..you're awesome..thanks so much
MEC06-03070 Rough-in9/21/20069/21/20069/21/2006 1:04:08 PMPFAIL
Dixie please call rhiannon Thanks; Phone #: ###-#### x222 Internet Inspection Request from: Rhiannon Stuck..called rhiannon to call for conference to discuss corrections with installer who did this job..i need his phone # in the notes..thanks
MEC06-02943 Rough-in9/21/20069/21/20069/21/2006 11:43:49 AMAPEND
Scheduled by a contractor via Hello! on 9/21/2006 at 5:37:20 AM. Contact: ###-####...hi shelley, i talked to the g/c and he gave me john shea (heating contractor) phone #..###-#### and said he's about 2 weeks out before they are ready. can you call and ask him to let you know when he calls his?? i'm soooo busy it would help me alot. thanks so much..dixie
MEC06-02459 Final9/20/20069/21/20069/21/2006 11:32:30 AMANR
Scheduled by a contractor via Hello! on 9/20/2006 at 9:35:00 AM. Contact: ###-####...waiting for duct detectors to be installed..talked to ben
MEC06-02459 Rough-in9/20/20069/21/20069/21/2006 11:31:46 AMAPASS
Scheduled by a contractor via Hello! on 9/20/2006 at 9:34:22 AM. Contact: ###-####...ok to drop ceiling tiles