Inspections for the day of: Thursday, September 21, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02721 FIRE-Final Inspection9/21/20069/21/20069/21/2006 3:34:24 PMPPASS
Life safety finaled
BLD05-01647 FIRE-Final Inspection9/21/20069/21/20069/21/2006 12:07:45 PMPPART
Phase I of the remodel is ok to occupy. Permit will be inspected for final when phase II is complete.
FIR06-00526 INSP-Sprinkler Rough-in/Hydro9/20/20069/21/20069/21/2006 12:02:39 PMAPASS
This inspection was for the maintenance shop addition. The tie-in, earthquaking and the sidewall head under the overhead door has been finished.
FIR06-00459 FIR-Aging Inspection9/21/20069/21/20069/21/2006 10:08:19 AM CANC
Permit voided
MIS06-00247 FIR-Final9/20/20069/21/20069/21/2006 10:07:28 AMAPART
A temporary occupancy was given until the exit sign is repaired or removed, provide door to remain unlocked sticker at the main exit, pendant sprinkler head to the north of the restroom is overspaced, approved hardware is installed on the rear door and the manual bolt on the rear door is removed.
FIR05-00587 INSP-Final Inspection9/20/20069/21/20069/21/2006 9:19:17 AMAPASS
permit finaled
FIR06-00259 INSP-Sprinkler Rough-in9/20/20069/21/20069/21/2006 8:44:30 AMAPASS
Underground supply piping is ok to cover. As measured the underground is not deep enough. I discussed this with Brian and the general contractor. The finish grade will need to be 1" above the north sewer access cover to meet code and will be checked at the final.