FIR07-00565
| INSP-Alarm Testing | 9/20/2007 | 9/21/2007 | 9/21/2007 4:21:53 PM | A | DONE |
|
|
See Sam Rogers inspection comments for the entire project.
|
BLD07-01819
| FIRE-Conference | 9/20/2007 | 9/21/2007 | 9/21/2007 4:20:19 PM | P | DONE |
|
|
I let the tenant know that since building the displays caused obstructions to the overhead sprinkler coverage and that sprinkler protection would be required within and in the combustible concealed spaces of the structures. They mentioned codes I was not familiar with that they claimed excluded the sprinkler coverage. I deferred them to Sam Rogers for building/fire codes that would allow the deletion of sprinkler coverage.
|
FIR07-00163
| INSP-Sprinkler Rough-in | 9/20/2007 | 9/21/2007 | 9/21/2007 4:04:47 PM | A | PASS |
|
|
The sprinkler piping above the layin ceiling tile areas are ok to cover.
|
FIR06-00811
| INSP-Alarm Testing | 9/18/2007 | 9/21/2007 | 9/21/2007 4:02:33 PM | A | DONE |
|
|
See the city approved plans for locations tested by Ken.
|
FIR06-00956
| INSP-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 4:01:44 PM | A | FAIL |
|
|
Todays inspection covered reinspecting the blocked sprinkler heads through out the building. The only areas not inspected for blockage are the 1st and 2nd floors of D wing.
|
FIR06-00957
| INSP-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 4:00:06 PM | A | FAIL |
|
|
Todays inspection covered reinspecting the blocked sprinkler heads through out the building. The only areas not inspected for blockage are the 1st and 2nd floors of D wing.
|
FIR06-00958
| INSP-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 3:58:44 PM | A | FAIL |
|
|
Todays inspection covered reinspecting the blocked sprinkler heads through out the building. The only areas not inspected for blockage are the 1st and 2nd floors of D wing.
|
BLD07-02296
| FIRE-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 2:51:35 PM | A | PART |
|
|
A temporary occupancy was given until fire extinguishers are provided, repair the emergency lights, remove the deadbolts, repair the fire alarm system and cover the trenches in the shop floor.
|
FIR06-00988
| INSP-Sprinkler Rough-in/Hydro | 9/20/2007 | 9/21/2007 | 9/21/2007 2:41:12 PM | A | PASS |
|
|
The underground flush for the future supply, located to the west of the new building has passed.
|
BLD07-01001
| FIRE-Final Inspection | 9/21/2007 | 9/21/2007 | 9/21/2007 12:40:08 PM | P | PASS |
|
|
fire life safety passed
|
FIR07-00586
| INSP-Sprinkler Rough-in | 9/20/2007 | 9/21/2007 | 9/21/2007 12:00:22 PM | A | PASS |
|
|
Sprinkler piping is ok to cover. The sprinkler system has been modified due to obstructions. As-built plans will be required at the final.
|
FIR07-00534
| INSP-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 11:47:01 AM | A | PASS |
|
|
permit finaled
|
FIR07-00781
| INSP-Sprinkler Rough-in/Hydro | 9/20/2007 | 9/21/2007 | 9/21/2007 8:53:42 AM | A | CANC |
|
|
Need hydro in the Garden Center, no earlier than 9 AM please. Charles is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|