Inspections for the day of: Monday, September 21, 2009.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01486 General Inspection6/8/20099/15/2009 A 
Winterization.
ESC08-00638 General Inspection9/21/20099/21/20099/21/2009 2:41:33 PM PASS
ESC09-00507 Complaint Inspection9/21/20099/21/20099/21/2009 2:31:39 PMPFAIL
Verbal to RP:
Clean up all sediment and debris off of all hardsurfaces. Complete by 9/24/09Pm.
ESC08-00675 General Inspection9/21/20099/21/20099/21/2009 1:51:26 PM DONE
no activity
ESC09-00444 Site Preparation9/21/20099/21/20099/21/2009 1:29:29 PM PASS
ESC09-00369 General Inspection9/21/20099/21/20099/21/2009 11:02:19 AMPFAIL
Verbal to RP:
1. Install perimeter sediment barrier along the north end of project area where slope is over a 2% grade.
2. Provide cover over the irragation grid at the North west corner of project.
3. Prior to a storm event or when grade is elevated install approved storm drain inlet protection on ALL storm drains through out project.
4. Maintain and re-install concrete washout ara with a top dressing of 2in plus drain rock for access to wahout pit.
Will re-inspect on 9/24/09 AM.
ESC09-00579 Site Preparation ESC9/21/20099/21/20099/21/2009 10:30:30 AM CANC
duplicate
ESC09-00579 Site Preparation9/17/20099/21/20099/21/2009 10:25:21 AMAPASS
Prior to the seeding mulch mix application. The installation of of energy disapaters needed. All in all work is coming along good.
ESC09-00537 BMP Violation9/18/20099/21/20099/21/2009 8:19:38 AMAPASS