Inspections for the day of: Tuesday, September 21, 2010.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC10-02868 Final9/20/20109/21/20109/21/2010 5:00:09 PMPNH
no answer
MEC10-02841 Final9/17/20109/21/20109/21/2010 4:29:08 PMPPASS
MEC10-02852 Final9/20/20109/21/20109/21/2010 4:10:01 PMPPASS
MEC10-01410 Final9/20/20109/21/20109/21/2010 3:58:13 PMPPASS
MEC10-02869 Final9/20/20109/21/20109/21/2010 3:45:11 PMPPASS
20#
MEC10-02162 Pressure Test9/20/20109/21/20109/21/2010 3:30:18 PMPPASS
60# test
MEC10-00527 Rough-in9/21/20109/21/20109/21/2010 3:12:09 PMPPASS
20# and 60#
MEC10-02863 Final9/20/20109/21/20109/21/2010 11:41:45 AMAPASS
MEC10-02869 Pressure Test9/20/20109/21/20109/21/2010 11:24:01 AMANR
MEC10-02832 Rough-in9/17/20109/21/20109/21/2010 10:49:31 AMAFAIL
correction notice at front window
MEC10-02828 Final9/20/20109/21/20109/21/2010 10:21:15 AMAPASS
MEC10-02818 Pressure Test9/21/20109/21/20109/21/2010 10:13:27 AMAFAIL
i was called by structural inspector on this job and he noticed that the pressure test had failed, but i had passed the r/i. i might have messed up on this, but the pressure test had failed and guage was on zero. sorry about this mix up. alan
MEC10-02817 Final9/16/20109/21/20109/17/2010 8:19:23 AMPCANC
Call 30 minutes before arriving, thanks. Phone #: ###-#### >> Inspection requested via web by Tom Soniville Inspection cancelled from web by: Tom Soniville