FIR11-00095
| INSP-Sprinkler Rough-in | 9/20/2011 | 9/21/2011 | 9/21/2011 4:27:50 PM | A | PASS |
|
|
The remaining warehouse area rough-in passed. See the city approved plans for the red lined comments that need corrected. Resubmittals are needed to show the piping size changes and additional heads and fittings in the remote areas.
|
BLD11-01097
| FIRE-Final Inspection | 9/20/2011 | 9/21/2011 | 9/21/2011 3:34:37 PM | P | PASS |
|
|
Life safety passed
|
FIR11-00454
| INSP-Sprinkler Rough-in/Hydro | 9/21/2011 | 9/21/2011 | 9/21/2011 3:27:07 PM | P | PASS |
|
|
Permit finaled
|
BLD10-02666
| FIRE-Conference | 9/21/2011 | 9/21/2011 | 9/21/2011 2:55:08 PM | A | DONE |
|
|
The flat roof area over the seating area can have the sheet rock applied to the bottom of the trusses. The truss spaces have been filled with non combustible insulation.
|
FIR11-00494
| INSP-Sprinkler Rough-in | 9/20/2011 | 9/21/2011 | 9/21/2011 9:42:56 AM | A | PASS |
|
|
The sprinkler piping in the womens restroom, first floor, is ok to cover. Two pendants are not changed to quick responce yet but will be checked at final. See red lines on city approved plans.
|
BLD11-02196
| FIRE-Final Inspection | 9/20/2011 | 9/21/2011 | 9/21/2011 9:11:37 AM | A | FAIL |
|
|
I called and left message on the contacts voice mail. I went to the project and found the doors locked and no one there. No inspection was performed. Allan Phone #: ###-####
|