Inspections for the day of: Wednesday, September 21, 2011.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00095 INSP-Sprinkler Rough-in9/20/20119/21/20119/21/2011 4:27:50 PMAPASS
The remaining warehouse area rough-in passed. See the city approved plans for the red lined comments that need corrected. Resubmittals are needed to show the piping size changes and additional heads and fittings in the remote areas.
BLD11-01097 FIRE-Final Inspection9/20/20119/21/20119/21/2011 3:34:37 PMPPASS
Life safety passed
FIR11-00454 INSP-Sprinkler Rough-in/Hydro9/21/20119/21/20119/21/2011 3:27:07 PMPPASS
Permit finaled
BLD10-02666 FIRE-Conference9/21/20119/21/20119/21/2011 2:55:08 PMADONE
The flat roof area over the seating area can have the sheet rock applied to the bottom of the trusses. The truss spaces have been filled with non combustible insulation.
FIR11-00494 INSP-Sprinkler Rough-in9/20/20119/21/20119/21/2011 9:42:56 AMAPASS
The sprinkler piping in the womens restroom, first floor, is ok to cover. Two pendants are not changed to quick responce yet but will be checked at final. See red lines on city approved plans.
BLD11-02196 FIRE-Final Inspection9/20/20119/21/20119/21/2011 9:11:37 AMAFAIL
I called and left message on the contacts voice mail. I went to the project and found the doors locked and no one there. No inspection was performed. Allan Phone #: ###-####