Inspections for the day of: Friday, September 21, 2012.
Number of inspections: 25
Percentage of inspections complete: 96 %
Percentage of inspections not complete: 4 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-01412 BLD-Final9/21/20129/21/20129/21/2012 5:18:19 PMPPASS
Mike Phone #: ###-####
C/C issued.
BLD12-01412 DOC - Permit Finaled9/21/20129/21/20129/21/2012 5:16:22 PMPPASS
BLD12-01838 BLD-Other9/20/20129/21/20129/21/2012 5:14:55 PMPPASS
sub floor insp//Steve Phone #: ###-####
Framing for 2nd story .....floor OK.
ESC12-00707 Site Final9/21/20129/21/20129/21/2012 4:21:35 PMPPASS
ESC12-00707 DOC - Permit Finaled9/21/20129/21/20129/21/2012 4:21:20 PMPPASS
BLD12-01798 BLD-Final9/21/20129/21/20129/21/2012 4:20:55 PMPPASS
kevin Phone #: ###-####
C/C issued.
BLD12-01798 DOC - Permit Finaled9/21/20129/21/20129/21/2012 4:20:24 PMPPASS
BLD12-02357 BLD-Final9/21/20129/21/20129/21/2012 4:05:16 PMPPASS
Sherrie ###-####
C/C issued
BLD12-02357 DOC - Permit Finaled9/21/20129/21/20129/21/2012 4:04:53 PMPPASS
BLD12-01393 BLD-Framing/Rough-in9/21/20129/21/20129/21/2012 2:37:34 PMPPART
JP ###-####
Roof element 1 and 3 framing ok and ready to fill with insulation. Element 2 (middle) filled with insulation and OK to cover.
BLD12-02476 BLD-Final9/20/20129/21/20129/21/2012 2:05:32 PMPPASS
Steve phone ###-####
BLD12-02476 DOC - Permit Finaled9/21/20129/21/20129/21/2012 2:03:39 PMPPASS
MIS12-00267 BLD-Conference9/20/20129/21/20129/21/2012 1:19:58 PMPDONE
Check back.......Obtained permit.
MIS12-00267 DOC - Permit Finaled9/21/20129/21/20129/21/2012 1:19:35 PMPPASS
ESC12-00505 Site Final9/20/20129/21/20129/21/2012 1:16:45 PMPPASS
Mike phone
ESC12-00505 DOC - Permit Finaled9/21/20129/21/20129/21/2012 1:16:29 PMPPASS
BLD12-01885 BLD-Final9/20/20129/21/20129/21/2012 1:15:19 PMAPASS
Jason Phone #: ###-####
OK for Perm Occ.
BLD12-02275 BLD-Framing/Rough-in9/20/20129/21/20129/21/2012 12:46:55 PMAPASS
call 1/2 hr before so can meet you//Clint Phone #: ###-####
BLD12-02342 BLD-Final9/20/20129/21/20129/21/2012 12:18:28 PMAPASS
elane Phone #: ###-####
BLD12-02342 DOC - Permit Finaled9/21/20129/21/20129/21/2012 12:18:06 PMPPASS
GCB12-00100 GCB-Footing9/20/20129/21/20129/21/2012 11:54:47 AMAPART
Nathan @ ###-####
AM inspection requested.
Footings and reinforcement appear OK. Side setbacks appear OK. No plot plan on site.....un-able to verify rear setbacks. Talked to super...Trey and Gen. contractor Nathan about this. Also notified concrete contractor that if they pour, they are pouring at thier own risk.
BLD12-01946 BLD-Energy code compliance9/18/20129/21/20129/21/2012 11:19:16 AMAPASS
David Phone #: ###-####
BLD12-02357 BLD-Final9/20/20129/21/20129/21/2012 11:16:58 AMANR
Sheri Phone #: ###-####
BLD12-01393 BLD-Framing/Rough-in9/20/20129/21/20129/21/2012 8:43:31 AMACANC
jp Phone #: ###-####
ESC12-00954 Site Preparation9/21/20129/21/2012