Inspections for the day of: Friday, September 21, 2012.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00131 General Inspection9/21/20129/21/20129/24/2012 1:22:49 PM FAIL
Verbal to RP(Tyson):
Maintain and replace washout area including the mortar mix area. Will re-inspect on 9/27/2012
ESC12-00939 Site Preparation9/21/20129/21/20129/21/2012 2:32:29 PM NR
ESC12-00783 Site Preparation9/21/20129/21/20129/21/2012 11:11:55 AM NR
Rescheduled for Oct. 1st.
ESC12-00516 General Inspection9/21/20129/21/20129/21/2012 11:04:42 AM DONE
Permit finaled.
ESC12-00516 DOC - Permit Finaled9/21/20129/21/20129/21/2012 11:04:25 AMPPASS
ESC12-00903 Site Preparation9/21/20129/21/20129/21/2012 10:32:16 AM NR
Will not begin until Mid October.
ESC12-00569 General Inspection9/21/20129/21/20129/21/2012 9:52:07 AMAFAIL
Verbal to RP:
Post ESC sign where visable from the street.
We discussed over the required perimeter controls. We have come to an agreement;
Must install perimeter contols (that are staged at the back of lot) once all contrate work for the footing and stem walls and the backfill is complete or if we have any forecasted storm events, all perimeter control must be installled.
ESC11-00117 General Inspection9/21/20129/21/20129/21/2012 9:35:24 AM PART
Verbal to RP:
Where the perimeter sediment control have been removed, must be re-installed.
ESC12-00467 General Inspection9/21/20129/21/20129/21/2012 9:22:49 AM FAIL
Meeting with the RP over project boundries to ensure perimeter control are installed in the proper areas.
ESC12-00843 Site Preparation9/21/20129/21/20129/21/2012 9:10:17 AM NR
ESC12-00852 Site Preparation9/21/20129/21/20129/21/2012 8:50:40 AM NR
ESC12-00855 Site Preparation9/21/20129/21/20129/21/2012 8:50:29 AM NR
ESC12-00839 Site Preparation9/21/20129/21/20129/21/2012 8:50:15 AM NR
ESC12-00856 Site Preparation9/21/20129/21/20129/21/2012 8:49:57 AM NR
ESC12-00907 Site Preparation9/21/20129/21/20129/21/2012 8:49:05 AM NR
ESC12-00443 Aging Inspection9/21/20129/21/20129/21/2012 8:32:45 AM PASS
ESC12-00442 Aging Inspection9/21/20129/21/20129/21/2012 8:32:02 AM PASS
ESC12-00441 Aging Inspection9/21/20129/21/20129/21/2012 8:30:37 AM PASS
ESC12-00444 Aging Inspection9/21/20129/21/20129/21/2012 8:29:30 AM PASS