ELE15-01348
| Final | 9/21/2016 | 9/21/2016 | 9/21/2016 2:47:03 PM | P | FAIL |
|
|
This is a inspection of level 2 only today. Please keep this permit active for remainder of floors. Contact Brandon Robinson for walk through. Phone #: ###-#### Inspection requested via web by Tom Betty All lighting for TI portion complete on 2nd floor only. Core and shell lighting not complete in stairways of 2nd floor. Bathrooms and corridors complete.
|
ELE16-01838
| Final | 9/20/2016 | 9/21/2016 | 9/21/2016 1:36:55 PM | A | FAIL |
|
|
Level 2 Stack 1,2,3,4 Branch Circuit Panels , Branch Circuit Equip conn., Branch Circuit Devices , Office Furniture Phone #: ###-#### Inspection requested via web by Tom Betty 110.3- In complete installation of office furniture all connections shall be complete. Some not connected to wiring supplied, some fed by panel 22C circuits 2, 4, 6 not working. All covers on furniture shall be installed and be securely fastened. 300.15- All boxes installed for cables, card readers, data, misc, all shall have covers installed. All covers for lighting control control panels shall be installed for TCO. 392.60- Cable trays and ladder racks in server rooms shall be completely bonded. 605.5- Complete office furniture connections. 800.110(C)(1)- All data cables shall be supported with in 3' of termination and not more than 10' between supports. Eccess loops elevator lobby, blinds, ect.
|
ELE15-01348
| Final | 9/20/2016 | 9/21/2016 | 9/21/2016 1:25:25 PM | A | FAIL |
|
|
Level 2 Stack 1,2,3,4 Electrical Rooms Phone #: ###-#### Inspection requested via web by Tom Betty 300.21- Complete fire caulking of penetrations in electrical room walls. Non-electrical found, sprinkler pipe, communication cables and conduits.
|
ELE16-00089
| Conference | 9/20/2016 | 9/21/2016 | 9/21/2016 10:49:34 AM | A | DONE |
|
|
Call Rafael to sign TCO sheets in ESI office. Phone #: ###-#### Inspection requested via web by Rafael Castillo Signed all TCO sheets for TI portion.
|
ELE15-00495
| Electrical Rough-In | 9/20/2016 | 9/21/2016 | 9/21/2016 10:48:40 AM | A | PASS |
|
|
TCO, check heat trace, and door on 2nd floor electric room. Phone #: ###-#### Inspection requested via web by Toby Groves All heat trace terminated in boxes, 2nd floor electrical room door mounted with proper hardware. Signed TCO sheets
|
ELE16-02557
| Electrical Rough-In | 9/20/2016 | 9/21/2016 | 9/21/2016 10:06:47 AM | A | PASS |
|
|
Randy. Final on 2nd ; 4th floor restrooms. Phone #: ###-#### Inspection requested via web by Sean DeLacy Baths on 2nd and 4th floor complete. Corridors on these floors not complete
|
ELE16-01923
| Final | 9/20/2016 | 9/21/2016 | 9/21/2016 9:14:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terry Scott Final ok
|
ELE16-03060
| Rough-In Permanent Service | 9/20/2016 | 9/21/2016 | 9/21/2016 8:55:42 AM | A | PASS |
|
|
whole house wiring please call if you have any questions Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Rough in ok cover p/s u/g n ok
|