Inspections for the day of: Wednesday, September 21, 2016.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-01667 Conference9/21/20169/21/20169/21/2016 2:11:27 PMPDONE
Had talked to Rock about access to split system heating above hard lid with access door.Need some clarification on working accessibility. Phone #: ###-#### Inspection requested via web by Tom Betty Manufacturers specs call for minimum 18" of working clearance for access panel.
ELE16-02821 Electrical Rough-In9/21/20169/21/20169/21/2016 12:54:49 PMPPASS
Potting and equle // Kevin Phone #: ###-#### ok cover
ELE16-02513 Electrical Rough-In9/21/20169/21/20169/21/2016 12:14:59 PMPPASS
Phone #: ###-#### Inspection requested via web by Rick Beckman ok cover
ELE16-02126 Electrical Rough-In9/21/20169/21/20169/21/2016 11:49:09 AMPPASS
Rough in inspection for basement only -- Final for upstairs not ready yet -- Phone #: ###-#### Inspection requested via web by Kendra Lanham rough in ok
ELE16-03053 Temporary Service9/20/20169/21/20169/21/2016 11:41:27 AMPPASS
Heather Stuckart will be your contact for this project ###-####. Please give her a call if you have any questions as she may not be on the job site. Thank you and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw t/s o/h n ok
ELE16-02855 Final9/20/20169/21/20169/21/2016 11:33:10 AMPCANC
I will call and Schedule a time to meet you onsite. Phone #: ###-#### Inspection requested via web by Matthew Dunay 1 solar panel broke during install, ordering new one.
ELE16-02428 Final9/21/20169/21/20169/21/2016 11:30:16 AMPPASS
Ron Phone #: ###-#### final ok
ELE16-01137 Final9/14/20169/21/20169/21/2016 11:06:33 AMAPASS
Home owner will be home between 10:30-1:30 if that works please Phone #: ###-#### Inspection requested via web by John VanZandt final ok
ELE16-02787 Final9/15/20169/21/20169/21/2016 9:47:42 AMAPASS
Final inspection please for this location. Please contact Rex Neilson at ###-#### 30 minutes prior to arrival so he can meet you there to let you in. David Forbes was the journeyman on the project and if you have any question please call him at ###-####. Thank you and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw final ok
ELE16-03063 Temporary Service9/20/20169/21/20169/21/2016 9:47:41 AMAPASS
Temp Pole is located behind trash enclosure on the south side of lot. Phone #: ###-#### Inspection requested via web by Ben Archibald t/s u/g n ok
ELE16-03062 Electrical Rough-In9/20/20169/21/20169/21/2016 8:59:13 AMAPASS
Phone #: ###-#### Inspection requested via web by Ben Archibald ok to cover
ELE16-03050 Electrical Rough-In9/21/20169/21/20169/21/2016 8:50:28 AMAPASS
Phone #: ###-#### Inspection requested via web by Randy Fletcher rough in ok
ELE16-03051 Electrical Rough-In9/20/20169/21/20169/21/2016 8:32:01 AMAPASS
Swimming pool partial underground and bonding Phone #: ###-#### Inspection requested via web by Lars Johnson As per Lars Johnson, 2 bonds at auto cover, bonded 2 lights at pool and 1 at hottub, pipe for lights stub in trench and other contractor is running pipe back to pool equipt room, bond for 1 ladder and a bond for 2 handrails, also 2 bonds for handicapped lifts.
ELE12-03157 Final9/20/20169/21/20169/21/2016 7:29:31 AMAPASS
Marco Phone #: ###-#### looked at job for final on 9/20/16. Homeowner called it in but it didnt go through for some reason.
ELE16-03063 Temporary Service9/20/20169/21/20169/20/2016 10:45:36 PMACANC
Phone #: ###-#### >> Inspection requested via web by Ben Archibald Inspection cancelled from web by: Ben Archibald
ELE16-03050 Electrical Rough-In9/20/20169/21/20169/20/2016 10:12:43 AMACANC
Phone #: ###-#### >> Inspection requested via web by Randy Fletcher Inspection cancelled from web by: Randy Fletcher