Inspections for the day of: Thursday, September 21, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-03079 Electrical Rough-In9/21/20179/21/20179/21/2017 2:37:42 PMPPASS
Call when on the way // Jose Phone #: ###-####
Conference room required receptacle outlets will be placed in floor due to movable partitians. Grid rough in ok cover
ELE17-03153 Electrical Rough-In9/21/20179/21/20179/21/2017 1:59:34 PMPPASS
Please give me half an hour notice to insure access. Than you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman
Repair due to water damage bathroom rough in ok cover
ELE17-02187 Final9/21/20179/21/20179/21/2017 1:13:35 PMPPASS
Kurt Phone #: ###-#### Final ok
ELE17-03142 Electrical Rough-In9/20/20179/21/20179/21/2017 11:11:23 AMAPASS
Keys are under front doormat for access Phone #: ###-#### Inspection requested via web by Zane Robertson
Plumbing not started at time of inspection. Master bed and bath and kitchen rough in ok cover
ELE17-03055 Rough-In Permanent Service9/20/20179/21/20179/21/2017 10:41:39 AMAPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn
Rough in ok cover p/s u/g n ok
ELE17-03148 Electrical Rough-In9/20/20179/21/20179/21/2017 10:07:52 AMAPASS
Job is complete. Final please Phone #: ###-#### Inspection requested via web by Stuart Welton Rough in ok
ELE17-03148 Final9/21/20179/21/20179/21/2017 10:07:41 AMPPASS
Job is complete. Final please Phone #: ###-#### Inspection requested via web by Stuart Welton Final ok
ELE17-03140 Electrical Rough-In9/20/20179/21/20179/21/2017 9:46:23 AMAPASS
Terry Cushing is the contact on site ###-#### Phone #: ###-#### Inspection requested via web by Debby Pierce
Future work to be permited when building permit is pulled.
Floor receptacles only rough in ok cover
ELE17-03150 Conference9/21/20179/21/20179/21/2017 9:25:36 AMPDONE
Please contact Tate Borstelman @ ###-####

Have a lovely day and THANK YOU!!! Phone #: ###-#### Inspection requested via web by JENNY EMEL
Discussed equipment grounding of new watt meter being installed for new solar array system. Single bonding point for grounded conductor shall remain in place, at watt meter location grounded conductor shall splice thru meter with grounding conductor to terminate at lugs and bond meter can. Grounded conductor shall not be connected to noncurrent carryiing metal parts on load side of service. If connection to grounded conductor needed for watt meter a tap shall be supplied off isolated connection of grounded conductor.