PLM16-00033
| Final | 9/20/2017 | 9/21/2017 | 9/21/2017 1:59:09 PM | A | PART |
|
|
Final for floors 1st -4th, if you have any questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 1) provide funnel for floor drains receiving condensate drainage. 2) open up cabinet at floor sink in food prep area. 3) open front seats required on public toilets. 4) hook up all equipment. 5) remove splitter at mop sink faucett for chemical station. 6) provide shutoff valves for clothes washers. 7) Ice bin drains at all ice machines may not be connected to other drains. 8) caulk mop sinks 9) expose condensate terminations in planters on 2nd floor. 10) complete insulation of exposed piping. 11) install pool room rp drip cup drains. 12) install 2nd floor booster pump relief lines. 13) 1st floor mechanical room incomplete. 14) rooms 302, 325, 402, 405 and 408 incomplete.
|
PLM17-01572
| Final | 9/20/2017 | 9/21/2017 | 9/21/2017 12:53:25 PM | A | PASS |
|
|
We will meet you at home from 10:30 - 11 AM. Flue pressure and final on tankless water heater. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM17-03185
| Plumbing Rough-in | 9/20/2017 | 9/21/2017 | 9/21/2017 10:59:58 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen water system test failed
|
PLM17-03070
| Final | 9/18/2017 | 9/21/2017 | 9/21/2017 9:32:19 AM | A | NR |
|
|
Please call Shawn with any questions. ###-####. Phone #: ###-#### Inspection requested via web by TIM OVERALL not ready
|
PLM17-01575
| Final | 9/18/2017 | 9/21/2017 | 9/21/2017 9:12:30 AM | A | PASS |
|
|
Please call Shawn with any questions ###-####. Phone #: ###-#### Inspection requested via web by TIM OVERALL
|